
2-26
C122-E001-10EN
CHAPTER 2 Setup
2.2.4
MMB initialization
This section explains the operations for various types of MMB initialization.
Note:
The MMB uses the following TCP/IP port numbers:
- 623/udp: RMCP communication
- 664/udp: RMCP communication
- 5000: Event communication from PSA
It is recommended to back up the setup information after completing the following
setup tasks.
For backing up the settings made here, see
Section 2.6, "Saving Configuration
z
(
→
)
z
Specifying a user account for the certified service engineer in charge
→
z
(
→
z
(
→
)
z
(
→
)
Содержание PRIMEQUEST 400 Series
Страница 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Страница 2: ......
Страница 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Страница 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Страница 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Страница 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Страница 22: ......
Страница 24: ......
Страница 42: ......
Страница 46: ......
Страница 122: ......
Страница 140: ...3 18 C122 E001 10EN CHAPTER 3 Operating System Installation The installation procedure is as follows ...
Страница 150: ...3 28 C122 E001 10EN CHAPTER 3 Operating System Installation The installation procedure is as follows ...
Страница 186: ......
Страница 354: ......
Страница 356: ......
Страница 378: ...C 4 C122 E001 10EN Appendix C Power Control Figure C 3 Circuit breaker locations Extended I O Cabinet Circuit breaker ...
Страница 394: ......
Страница 428: ......
Страница 445: ......
Страница 446: ...Back Cover ...