
4-72
C122-E001-10EN
CHAPTER 4 Work Required After Operating System Installation
5
A list of network adapters is displayed for teaming.
Select [Intel(R) PRO/100 VE Network Connection] and [Intel(R) Pro/100 M
Network Connection] check boxes, and click the [Next] button.
Figure 4.18 List of network adapters
6
Select [Adapter Fault Tolerance] from the mode list, and click the [Next] button.
Figure 4.19 List of team mode
Содержание PRIMEQUEST 400 Series
Страница 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Страница 2: ......
Страница 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Страница 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Страница 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Страница 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Страница 22: ......
Страница 24: ......
Страница 42: ......
Страница 46: ......
Страница 122: ......
Страница 140: ...3 18 C122 E001 10EN CHAPTER 3 Operating System Installation The installation procedure is as follows ...
Страница 150: ...3 28 C122 E001 10EN CHAPTER 3 Operating System Installation The installation procedure is as follows ...
Страница 186: ......
Страница 354: ......
Страница 356: ......
Страница 378: ...C 4 C122 E001 10EN Appendix C Power Control Figure C 3 Circuit breaker locations Extended I O Cabinet Circuit breaker ...
Страница 394: ......
Страница 428: ......
Страница 445: ......
Страница 446: ...Back Cover ...