![background image](http://html.mh-extra.com/html/fujitsu/celsius-m740/celsius-m740_operating-manual_118534052.webp)
System expansions
Mounting or replugging the cold plug master cable
In general, connectors P0-P3 of the cold plug master cable are preassembled in slots EP0-EP3
of the standard assembly kit. Thus, four 3
1
/
2
" drives can be operated:
Assignment 1 Standard assembly kit:
EP0 / P0
EP1 / P1
EP2 / P2
EP3 / P3
EP4
EP5
EP6
EP7
Slot EP0 = Connector P0 (Boot-HDD)
Slot EP1 = Connector P1
Slot EP2 = Connector P2
Slot EP3 = Connector P3
Assignment 1 with connected connectors:
48
Fujitsu
Содержание CELSIUS M740
Страница 1: ...System Operating Manual FUJITSU Workstation CELSIUS M740 CELSIUS M740power ...
Страница 3: ......