![Fujitsu ASTG12CMCB Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/fujitsu/astg12cmcb/astg12cmcb_installation-manual_2344371008.webp)
En-8
8. FINISHING
(1) Insulate between pipes.
• Insulate suction and discharge pipes separately.
• For rear, right, and bottom piping, overlap the connection pipe heat insulation and
indoor unit pipe heat insulation and bind them with vinyl tape so that there is no gap.
(2) Temporarily fasten the connection cable along the connection pipe with vinyl tape.
(Wrap to about 1/3 the width of the tape from the bottom of the pipe so that water
does not enter.)
(3) Fasten the connection pipe to the outside wall with a saddle, etc.
(4) Fill the gap between the outside wall pipe hole and the pipe with sealer so that rain
water and wind cannot blow in.
(5) Fasten the drain hose to the outside wall, etc.
*Locally purchased
Pipe
Saddle*
Outside wall cap*
Sealer putty*
(Outdoors)
Wall
Overlap the insulation
Vinyl tape
Wrap with cloth tape
Cloth tape
Drain hose
Pipe
Connection pipe
(heat insulation)
Indoor unit pipe
(heat insulation)
Bind the pipes together
so that there is no gap.
Check the following:
GOOD
Drain hose
Saddle
Lifted up
Wave
End in water
PROHIBITED
9. FRONT PANEL REMOVAL AND INSTALLATION
Intake grill removal
Intake grill installation
b
a
Open the intake
grille. While gently
pressing the left
and right mounting
shafts of the intake
grille outward “a”,
remove the intake
grille in direction of
the arrow “b”.
c
While holding the
grille horizontal, set
the left and right
mounting shafts into
the pillow blocks at
the top of the panel
“c”.
To latch each shaft
properly, insert the
shaft until it snaps.
Press 4 places on
the intake grille to
close it completely.
9.1. Front panel removal
(1) Remove intake grille (Reference the intake grille removal.)
(2) Remove 3 caps.
(3) Remove wire cover.
(4) Remove 7 screws.
Screws (Wire cover )
Screws ( 6 position )
Caps ( 3 position )
Wire cover
(5) The front panel is pulled to the front, raising the upper surface, and a front panel is
removed.
Front panel
9.2. Front panel installation
(1) First,
fi
t the lower part of the front panel, and insert top and bottom hooks. (3 top
sides, 2 center)
Indoor unit
Front panel Latches (2 position)
Center hooks
(2 position)
Top hooks
(3 position)
Top holes (3 position)
(2) Attach the 6 screws.
(3) Attach the wire cover.
(4) Attach the 3 caps.
(5) Attach the intake grille.
CAUTION
Install the front panel and intake grille securely. If installation is imperfect, the front
panel or intake grille may fall off and cause injury.
10. TEST RUN
Check items
(1) Is operation of each button on the remote control unit normal?
(2) Does each lamp light normally?
(3) Do
air
fl
ow direction louvers operate normally?
(4) Is the drain normal?
(5) Do not have an abnormal noise and vibration during operation?
Do not operate the air conditioner in test run for a long time.
[Operation method]
Before starting the test run, wait for 1 minute after connecting the power supply.
By the wireless remote controller
To start the test run, press the START/STOP button, the TEST RUN button on the
remote controller with a by using the tip of a ballpoint pen or other small object.
By the indoor unit
To start the test run, keep on pressing the MANUAL AUTO button of the indoor unit for
more than 10 seconds.
To end test operation, press the remote controller START/STOP button.
(When the air conditioner is running by pressing the TEST RUN button, the
OPERATION Lamp and TIMER Lamp will simultaneously
fl
ash slowly.)
[Using the wired remote controller] (Option)
For the operation method, refer to the operating manual and the installation manual of the
optional remote controller.
9333005201_IM_En_ASTG09KMCA.indd 8
9333005201_IM_En_ASTG09KMCA.indd 8
2017/1/20 11:43:05
2017/1/20 11:43:05
Содержание ASTG12CMCB
Страница 16: ......