
4-4
Care and Maintenance
4
FCR PRIMA T2 Operation Manual 897N102546
■ Preventive maintenance to be performed when the machine has
been used for three years or when a process count of about
18,000 is reached
Perform the preventive maintenance shown below.
Cleaning of the parts
• Reflection plate, and filter of the erasure unit
• Covers, shutter
Checking the Machine
• Erasure lamp lighting time
• Protective grounding
• Image/conveyance
• S value
• Error log
■ Preventive maintenance to be performed when the machine has
been used for four years or when a process count of about 24,000
is reached
Perform the preventive maintenance shown below.
Cleaning of the parts
• Suction cups, rubber rollers
• Reflection plate, and filter of the erasure unit
• Light-collecting guide
• Covers, shutter
Checking the Machine
• Erasure lamp lighting time
• Protective grounding
• Image/conveyance
• S value
• Error log
■ Preventive maintenance to be performed when the machine has
been used for five years or when a process count of about 30,000
is reached
Perform the preventive maintenance shown below.
Cleaning of the parts
• Reflection plate, and filter of the erasure unit
• Covers, shutter
Checking the Machine
• Erasure lamp lighting time
• Protective grounding
• Image/conveyance
• S value
• Error log
Содержание CR-IR 392
Страница 2: ...ii FCR PRIMA T2 Operation Manual 897N102546...
Страница 32: ...A 2 Appendix A Specifications FCR PRIMA T2 Operation Manual 897N102546...
Страница 34: ......