Sedimentation Chamber
1
Anaerobic Filtration Chamber
2
Aerobic Contact Filtration Chamber
3
Storage Chamber
4
Disinfection Chamber
5
Total Volume
Anaerobic Media
Board Type Aerobic Media
Aerobic Media
Blower
Tank
Piping
Access Covers
Disinfectant (Optional)
Volume (gal)
1,200
1,198
550
268
17
3,233
CHAMBER
SPECIFICATIONS
PVC / PP / PE
Filling Rate
47%
17%
56%
Filling Rate
Filling Rate
PP / PE
PP / PE
7 cfm
FRP
Plastic / Cast Iron
Chlorine Tablets
PVC / PP / PE
15'-3"
6'-53
4"
4" INLET PIPE
INLET BAFFLE
VENTILATION PIPE
SCUM BAFFLE
RICIRCULATION
AIRLIFT PUMP
DISINFECTION
CYLINDER (OPTIONAL)
4" OUTLET PIPE
EFFLUENT
AIRLIFT PUMP
AIR INTAKE
FLOW BAFFLE
(CLEANING OPENING)
RECIRCULATION PIPE
FLOW OPENING (TYP)
B
B
5'-53
4"
5'-2"
3'-95
8
"
A
A
PLAN VIEW
18" MANHOLE
18" MANHOLE
7'-4"
5'-11"
1'-33
4"
5'-91
4"
WL
HWL
WL
1
2
3
4
5
3
1
2
3
4
5
24" MANHOLE
5'-87
8
"
1'-57
8
"
RECIRCULATION
ASSEMBLY
SECTION A-A VIEW
FLOW OPENING
AERATION ASSEMBLY
DISINFECTION
CYLINDER (OPTIONAL)
24" MANHOLE
FLOW OPENING
BOARD TYPE
CONTACT MEDIA
RECIRCULATION
AIRLIFT ASSEMBLY
AEROBIC MEDIA
7'-23
4"
81
2"
2'-87
8
"
1'-53
4"
101
4"
5'-91
4"
SECTION B-B VIEW
Standard Hydraulic Load
CEN21
1900 GPD
CEN21 Structural Drawing
DATE:
SCALE:
05/21/2014
1/4" = 1"
Содержание CE Series
Страница 8: ...6 ...
Страница 11: ...Co troller A Wiri g Diagram 9 ...
Страница 12: ...Co troller C Wiri g Diagram 10 ...
Страница 14: ...12 ...
Страница 22: ... 20 ...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 41: ... PAGE 1 OF 7 PAGES ...
Страница 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Страница 46: ...PAGE 7 OF 7 PAGES ...