“tep : Usi g supplied adaptors a d fitti gs, atta h air pipe fitti g to ta k a d o e t to ¾
o duit i prepared tre h i . deep to lo atio of air lo er. Please ote: ¾ fle i le
irrigation line, 100 PSI Max, may also be used for the airline.
Step 8: Locating and Installing Blower/Control Panel.
USING ¾-INCH CONDUIT, LOCATE BLOWER WITHIN 100-FT.
OF TREATMENT TANK AND WITH NO MORE THAN FIVE (5)
ELBOWS. If site conditions prevent this, please contact your
distributor or Fuji Clean USA for technical assistance.
Air Blower shall be:
in as close proximity to control panel as possible
on a solid (e.g. concrete) pad to minimize vibrations
in a location above water level
away from grease exhaust fans.
away from bedroom windows and other locations where
operational sounds (although minimal) may be a nuisance
In a location that allows unencumbered access for
inspection and maintenance activity
with proper electrical grounding
with wiring and electrical connections made by a licensed
electrician.
with no objects on top of electrical cord.
in a well-ventilated space out of direct sunlight and
protected from elements such as direct rain or snowfall.
Hardwired to power in states and jurisdictions that require
a hardwired connection.
¾ PVC o duit
For connection air line to tank, use
sealant meeting ASTM C990-96
standard to prevent septic gas
transmission into control panel.
Note: Some states and contractors require
a flexible airline adaptor as shown.
(adaptors supplied by Fuji Clean USA)
Hardwired power
connection option
26
Содержание CE Series
Страница 8: ...6 ...
Страница 11: ...Co troller A Wiri g Diagram 9 ...
Страница 12: ...Co troller C Wiri g Diagram 10 ...
Страница 14: ...12 ...
Страница 22: ... 20 ...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 41: ... PAGE 1 OF 7 PAGES ...
Страница 42: ... 30 ELBOW 120 WYE 45 ELBOW 45 BEND PAGE 2 OF 7 PAGES ...
Страница 46: ...PAGE 7 OF 7 PAGES ...