6. OPERATION START AND STOP
6.1 Operation start
After correct wiring and piping has been completed, turn on the converter to start measurement.
Note: 10 min. of warm-up time is necessary after power ON.
Caution of before starting operation
(1)
Furnace operation should be started after an elapsed time of 10 minutes from the point of turn-
ing ”ON” the power supply of this unit
(2)
When a detector is to be installed in a furnace already in operation, take care to blow out harmful
gas from the furnace and then install the fully warmed up detector quickly.
(3)
Control of detector temperature may get unstable depending on the ambient temperature, power
supply voltage, and other conditions. In such a case (especially when you first use the analyzer),
perform PID auto-tuning after the stop of warm-up (Refer to 10.4.8 PID auto tuning).
6.2 Operation stop
6.2.1.1 When a process (furnace etc.) is to be shutdown for a short time i.e. a week
or so
It is strongly recommended to keep the detector in operation to avoid possible deterioration of platinum elec-
trodes in the detector and detector break-down due to repetition of power ON-OFF in a moisture absorption
state.
In case of the detector with an ejector (option), shutdown the air source.
6.2.1.2 When a process (furnace etc.) is to be shutdown for a long time
Turn OFF the power switch of the instrument after gas in the furnace has been replaced completely by ambi-
ent air.
Содержание ZKMA
Страница 1: ......
Страница 13: ...2 INZ TN2ZKMA E 2 OPERATING PARTS AND THEIR FUNCTIONS 2 1 Outline Drawing 1 ZKMA 2 ZKMB...
Страница 22: ...11 INZ TN2ZKMA E 4 2 2 Cable gland and input and output lines 1 ZKMA 2 ZKMB...
Страница 23: ...12 INZ TN2ZKMA E 4 2 3 Allocation of the terminal block...
Страница 24: ...13 INZ TN2ZKMA E 4 3 Wiring and piping diagram 4 3 1 1 Flow guide tube system...
Страница 25: ...14 INZ TN2ZKMA E 4 3 1 2 Flow guide tube system with valve...
Страница 26: ...15 INZ TN2ZKMA E 4 3 1 3 Ejector system...
Страница 27: ...16 INZ TN2ZKMA E 4 3 1 4 Ejector system with valve...
Страница 31: ...20 INZ TN2ZKMA E 5 2 Key operation flow diagram outline...
Страница 32: ...21 INZ TN2ZKMA E...
Страница 33: ...22 INZ TN2ZKMA E...
Страница 34: ...23 INZ TN2ZKMA E...
Страница 113: ...102 INZ TN2ZKMA E 11 SPECIFICATIONS 11 1 Specifications...
Страница 114: ...103 INZ TN2ZKMA E...
Страница 115: ...104 INZ TN2ZKMA E 11 2 Code symbols Converter...
Страница 116: ...105 INZ TN2ZKMA E Detector...
Страница 117: ...106 INZ TN2ZKMA E Ejector Exclusive cable...
Страница 118: ......