Lead
wire
Put a screwdriver tip into
the terminal and press in the spring.
5 ~ 6 mm
1 . 2 5 s q
(solder the exposed end)
Twist the strands together.
How to prerare
the lead wire
How to connect lead wires
Connection procedures
1. Installing a load cell
①
Install the load cell on the shank on the press, or on the center of the jig
(
see the dimension drawings
on pages 28 and 29
)
. When installing a load cell that was designed to be mounted on the ram shank
(
003, 03, 10U, 20U
)
, make sure to secure it at two points, so that the diagonally shaded area
(
the loaded
face
)
shown in the dimension drawings contacts the press shank properly.
・
Do not pull on the load cell cable. When securing the cable, allow enough cable length so that it
still has some slack when the press is at bottom dead center.
・
Although the load cell is sealed, be careful not to pour organic solvents such as a thinner, water, or
machine oil directly on it.
②
Connect the load cell cable to the 5P connector on the back of the CM-5 housing, and lock it securely
in place.
2. When installing a jig (a load cell that is designed to be mounted on a ram shank)
Insert the upper part of the jig into the ram shank designed for the load cell. Tighten the two bolts evenly
while being careful to align each side perfectly parallel.
3. CM-5 measurement device installation
There are two holes on the bottom of the CM-5 housing
(
see the "Measurement device dimension
drawings" on page 28
)
. Use these holes for attach the CM-5 to a mounting plate. Do not insert screws
that go deeper than 10 mm inside the CM-5 housing.
NOTE:
If a screw is inserted deeper than 10 mm, it will contact the components inside of the case
and damage the device.
4. Reset (start) signal
Referring to the figures below, connect the lead wire for the start signal to terminals
①
and
②(
reset
)
.
(
Make sure that the terminals are shorted when the press starts moving.
)
CAUTION
1. Before connecting the lead wire, be sure to unplug the power cord at the wall.
2. Make sure that the wire you are connecting does not contact any other
terminals.
5. Load measurement complete signal (sensor END)
Connect the lead wire from the load measurement complete signal sensor to terminals
③
and
④ (
end
)
.
(
See the "Load measurement complete signal terminals" on page 7.
)
6. Power plug
Plug the power cord into a standard wall outlet.
(
100 VAC, 50/60 Hz
)
CAUTION
When making connections to the terminal block, be careful not to mis-wire the
100 VAC circuit
(
GO, NG contact terminal
)
. Mis-wiring may destroy the internal
circuits.