1 0 0 V A C
5 0 / 6 0 H z
1 0 0 V A C
5 0 / 6 0 H z
Counter
(Up)
Counter
CAUKING SPRECIFICATIONS
To terminal of terminal block on the back of the measurement device
ON:Normal operation
OFF:Inching operation
ON:Normal operation
OFF:Inching operation
To terminal of terminal block on the back of the measurement device
To terminal of terminal block on the back of the measurement device
1
2
1
(Up)
To terminal of terminal block on the back of the measurement device
3
To terminal of terminal block on the back of the measurement device
4
To terminal of terminal block on the back of the measurement device
2
If you want to use an emergency stop push button, connect it to terminals 1 and 2.
Normally, SV-2 is not used.( It is used for high and low speed, 2 speed feed. )
(Down)
Power
Power
(Down)
Buzzer
Buzzer
Measurement complete signal
Reset signal
Reset signal
PRESS FITTING SPECIFICATIONS
NOTE:"BS" are push button switches that must be pressed with both hands.
LS-1 : ON at press lower limit
LS-2 : OFF at press upper limit
Micro-switch
−
30
−
Circuit examples for connecting a timer box
The examples below show circuits for press fitting and caulking operations after the CHECK MAN
connected to a pneumatic press, and how to control them using a timer box.
Содержание CHECK MAN CM-5
Страница 31: ...27...