FTS Systems LyoStar™ 3
Liquid Nitrogen Trap
Rev 006, 01/14
23
© SP Scientific 2014
To activate the liquid nitrogen trap, open the inlet and outlet valves. Ensure
6.
that the bypass valve is closed. When the liquid nitrogen trap is in use, all
valves should be parallel as shown below.
To bypass the liquid nitrogen trap, open the bypass valve and close the inlet
7.
and outlet valves.
When liquid nitrogen is no longer needed, shut off the supply line and then
8.
depress the fill button several times to bleed the supply line.
Outlet Valve
(closed position)
Bypass Valve
(open position)
Inlet Valve
(closed position)
Outlet Valve
(open position)
Bypass Valve
(closed position)
Inlet Valve
(open position)
Содержание LYOSTAR 3
Страница 1: ...LYOPHILIZER OPERATOR S MANUAL FTS SYSTEMS LYOSTAR 3 RESEARCH DEVELOPMENT PILOT SCALE FREEZE DRYER...
Страница 2: ......
Страница 6: ...iv Rev 006 01 14 SP Scientific 2014...
Страница 10: ...Contents FTS Systems LyoStar 3 viii Rev 006 01 14 SP Scientific 2014...
Страница 18: ...Getting Started FTS Systems LyoStar 3 8 Rev 006 01 14 SP Scientific 2014...
Страница 30: ...Operating your Lyophilizer FTS Systems LyoStar 3 20 Rev 006 01 14 SP Scientific 2014...
Страница 36: ...Liquid Nitrogen Trap FTS Systems LyoStar 3 26 Rev 006 01 14 SP Scientific 2014...
Страница 48: ...Sample Extractor Assemblies FTS Systems LyoStar 3 38 Rev 006 01 14 SP Scientific 2014...
Страница 52: ...Stoppering FTS Systems LyoStar 3 42 Rev 006 01 14 SP Scientific 2014...
Страница 56: ...Shelf Latching FTS Systems LyoStar 3 46 Rev 006 01 14 SP Scientific 2014...
Страница 64: ...Praxair s ControLyo Nucleation On Demand Technology FTS Systems LyoStar 3 54 Rev 006 01 14 SP Scientific 2014...
Страница 74: ...Appendix A Sample Recipe FTS Systems LyoStar 3 64 Rev 006 01 14 SP Scientific 2014...
Страница 80: ...Appendix C Stainless Steel Cleaners FTS Systems LyoStar 3 70 Rev 006 01 14 SP Scientific 2014...
Страница 81: ......