Contents
Auxiliary power supply cabling
Selection criteria for current transformer
Connecting the current transformers
Connecting the data communication cable to the inverter
Terminating resistors - Explanation of symbols
Multi-meter system - Explanation of symbols
Setting the transformation ratio of the current and voltage transformers
Setting the address on the Fronius Smart Meter TS
Connecting to the Fronius Datamanager
Configuring the Fronius Smart Meter TS as the primary meter
Configuring the Fronius Smart Meter TS as a secondary meter
Installation using the web browser
Configuring the Fronius Smart Meter TS as the primary meter
Configuring the Fronius Smart Meter TS as a secondary meter
Fronius manufacturer's warranty
3
EN
Содержание Smart Meter TS 5kA-3
Страница 2: ......
Страница 4: ...4 ...
Страница 5: ...Safety rules 5 ...
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 11: ...General information 11 ...
Страница 12: ...12 ...
Страница 15: ...Installation 15 ...
Страница 16: ...16 ...
Страница 19: ...1N1E 3 2E 1 3 3 2E 1 3 3 3E 19 EN ...
Страница 30: ...30 ...
Страница 31: ...Start up 31 ...
Страница 32: ...32 ...
Страница 41: ...41 EN ...
Страница 42: ...42 ...
Страница 43: ...43 EN ...