background image

Energy

Response time after switch-on
(EN IEC 62053-21, EN IEC 62053-23)

< 5 s

kCT x kVT

Maximum display  

Resolution

1 - 9.9

9 9 9 9 9 9 . 9 9 kWh / kvarh

10 Wh / varh

10 - 99.9

9 9 9 9 9 9 9 . 9 kWh / kvarh

100 Wh / varh

100 - 999.9

9 9 9 9 9 9 9 9 kWh / kvarh

1 kWh / varh

≥ 1000

9 9 9 9 9 9 . 9 9 MWh / kvarh

10 kWh / varh

Average power

Measured variable

Effective power

Calculation

Average value over set period of time

Integration time

5 / 8 / 10 / 15 / 20 / 30 / 60 minutes

Output

RS485 communication

Electrically isolated from input and auxiliary voltage

Standard

RS485 - 3 conductors

Transmission

Serial, asynchronous

Protocol

Modbus RTU

Addresses

1 - 255

Number of bits

8

Stop bit

1

Parity bit

None - even - odd

Baud rate

9600, 19200, 38400 bit/s

Response time

≤ 200 ms

Insulation (EN IEC 62052-11, EN IEC 62053-21)

Installation category

III

Degree of pollution

2

Insulation voltage

4 kV RMS

Impulse withstand voltage
Test circuit

4 kV 1.2/60 µs
Voltage input, current input, pulse output,
communication

Test voltage
Test circuit

2.75 kV RMS. 50 Hz/1 min
Voltage input, current input, pulse output,
communication

Test voltage
Test circuit

4 kV RMS. 50 Hz/1 min
All circuits and earth

Electromagnetic compatibility

Test in acc. with EN IEC 62052-11

 

39

EN

Содержание Smart Meter TS 5kA-3

Страница 1: ...rced from certified sustainable forests FSC Perfect Charging Perfect Welding Solar Energy Fronius Smart Meter TS 5kA 3 EN Operating instructions PV system monitoring 42 0426 0348 EN 005 28072020 www youtube com FroniusSolar LEARN MORE WITH OUR HOW TO VIDEOS ...

Страница 2: ......

Страница 3: ...nating resistors Explanation of symbols 23 Terminating resistors 23 Multi meter system Explanation of symbols 24 Multi meter system 25 Parameters menu 26 Setting the transformation ratio of the current and voltage transformers 27 Setting the address on the Fronius Smart Meter TS 28 Start up 31 Fronius SnapINverter 33 General 33 Connecting to the Fronius Datamanager 33 Configuring the Fronius Smart...

Страница 4: ...4 ...

Страница 5: ...Safety rules 5 ...

Страница 6: ...6 ...

Страница 7: ...here is a danger of Injury or death to the operator or a third party Damage to the device and other material assets belonging to the operating company Any safety devices that are not fully functional must be repaired by an authorised spe cialist before the device is switched on Never bypass or disable protection devices For the location of the safety and danger notices on the device refer to the s...

Страница 8: ...N rail with corresponding back up fuses which are adapted to the cable cross sections of the copper conductors and to the maximum cur rent of the meter The Fronius Smart Meter TS must only be operated in accordance with the specifications in the enclosed documentation and in accordance with local laws reg ulations provisions standards and within the limits of technical possibilities Any use of the...

Страница 9: ...mplementation as national law electrical equipment that has reached the end of its life must be collected separately and returned to an approved recycling facility Any device that you no longer require must be returned to your distributor or disposed of at an approved collection and recyc ling facility in your area Ignoring this European Directive may have potentially adverse effects on the enviro...

Страница 10: ...10 ...

Страница 11: ...General information 11 ...

Страница 12: ...12 ...

Страница 13: ...al electricity meter which optimises self con sumption and records the household s load curve In conjunction with the Fronius inverter Fronius Datamanager and Fronius data interface the Fronius Smart Meter TS provides a clear overview of a user s own power consumption The meter measures the power flow to the loads or to the grid and forwards the informa tion via the Modbus RTU RS485 communication ...

Страница 14: ...nstalled in the following positions in the system Positioning at the feed in point 0 0 16 7 Positioning at consumption point 0 0 16 7 For use as a secondary meter to measure individual loads and producers see chapter Multi meter system on page 25 14 ...

Страница 15: ...Installation 15 ...

Страница 16: ...16 ...

Страница 17: ...y set terminating resistors see Terminating resistors on page 23 11 Tug on each wire and plug to make sure that they are securely connected to the ter minal blocks 12 Switch on the power supply to the Fronius Smart Meter TS 13 Check the firmware version of the Fronius system monitoring To ensure compatibil ity between the inverter and the Fronius Smart Meter TS the software must always be kept up ...

Страница 18: ...on which must interrupt both neutral and non earthed cables concurrently Auxiliary power supply cabling IMPORTANT An auxiliary power supply is required to operate the Fronius Smart Meter TS The fuse must match the dimensions of the conductors L N N L Cabling IMPORTANT Always switch off the power supply before connecting the mains voltage inputs to the Fronius Smart Meter TS Recommended thickness o...

Страница 19: ...1N1E 3 2E 1 3 3 2E 1 3 3 3E 19 EN ...

Страница 20: ...not use current transformers with a voltage output Current transformers are directional If they are mounted backwards or with swapped wires the measured power will be negative Primary current Maximum current per phase A current converter with a primary current greater than the 20 ...

Страница 21: ...tion of the Fronius Smart Meter TS is 0 5 VA Line resistance 0 6 VA self consumption 0 5 VA 1 1 VA A current transformer with a rating of 1 5 VA 5 VA or higher is suitable here Accuracy class Use Class 1 or better Class 0 5 0 2 etc Class 1 is equivalent to a deviation of 1 of the secondary current at maximum power Mounting Rigid or hinged Rigid is usually cheaper with better power and accuracy val...

Страница 22: ...rs can be installed in the system see chapter Multi meter system on page 25 Fronius Inverter ON D D OUTPUT RS 485 T D M M D GND To avoid interference the terminating resistor must be used see chapter Terminating resistors on page 23 This is integrated in the Fronius Smart Meter TS and must be manufactured with a wire between M and T T termination ATTENTION More information on successful commission...

Страница 23: ...d T Modbus RTU slave e g Fronius Ohmpilot Fronius Solar Battery etc Terminating resistor R 120 Ohm Terminating res istors Due to interference it is recommended that terminating resistors are used as illustrated below to ensure proper functioning OPTION 1 0 0 16 7 Manufacturer manual max 300 m GND T D M M D 0 0 16 7 Manufacturer manual Manufacturer manual OPTION 2 max 300 m GND T D M M D 23 EN ...

Страница 24: ...n the system if insufficient power is being generated by the solar modules or supplied by the battery Inverter in the system e g Fronius Primo Fronius Symo etc 0 0 16 7 Utility meter Measures the measurement data relevant for billing amounts of energy in particular kilowatt hours of energy sourced from the grid and energy fed into the grid Based on the relevant billing data the electricity retaile...

Страница 25: ...mption branch and provides measurement data for energy pro filing in Fronius Solar web Loads in the system e g washing machine lamps TV etc Additional loads in the system e g heat pump Additional producers in the system e g wind power plant Terminating resistor R 120 Ohm Multi meter sys tem If several Fronius Smart Meter TS are installed a separate address must be set for each see Setting the addr...

Страница 26: ...ned individually for each channel For PV systems with inverters from the Fronius GEN24 and Fronius Tauro product series the following must be observed The primary meter and the battery must be connected to different channels The remaining Modbus participants must be distributed equally Parameters menu Screen Code Description Values PASS P1 Enter the current password 2633 nPASS P2 Password change F...

Страница 27: ...ArITY P16 Parity Even No STOP bit P16 2 Only if parity No Stop bit 1 2 rESET P17 Activation of the reset function for energy tariffs maximum requested power and part val ues of active and reactive energy the latter are only transmitted via the serial inter face No reset function deactiv ated Yes reset function activated End P18 Returns to the measured vari ables start screen None Factory settings ...

Страница 28: ... for 2 seconds to exit the settings Ratio of current transformers1 0001 10002 Ratio of voltage transformers1 3 001 0 10002 1 Important Changing the transformation ratios will reset the counters in the Fronius Smart Meter TS to 0 2 Transformation ratio in the current transformer x Transformation ratio of the voltage transformers max 1000 3 Changeover only when using voltage transformers direct volt...

Страница 29: ... Down and confirm each individual value with Enter P14 AddrESS 001 PrG 1 Use Up or Down to access the P14 screen 2 Press and hold Enter for 2 seconds 3 Set the address with Up and Down and confirm each individual value with Enter 4 Press Up to access screen P18 and press and hold Enter for 2 seconds to exit the settings 29 EN ...

Страница 30: ...30 ...

Страница 31: ...Start up 31 ...

Страница 32: ...32 ...

Страница 33: ...ager IP switch in the A position 3 In the browser address bar enter and confirm the IP address http 169 254 0 180 and confirm Configuring the Fronius Smart Meter TS as the primary meter 1 Go to the Fronius Datamanager website Open the web browser In the address bar of the browser enter the IP address IP address for WLAN 192 168 250 181 IP address for LAN 169 254 0 180 or the host and domain name o...

Страница 34: ... 180 or the host and domain name of the Fronius Datamanager and confirm The Fronius Datamanager website will be displayed 2 Click the Settings button 3 Log in to the login area with the service user and the service password 4 Call up the Meter menu area 5 Select the secondary meter from the drop down list 6 Click the Add button 7 Enter the name of the secondary meter in the Name input field 8 Ente...

Страница 35: ...e inverter in the network settings the inverter is dis played with the name FRONIUS_PILOT and the serial number of the device 3 Password enter 12345678 and confirm IMPORTANT To enter the password on a Windows 10 operating system the link Connect using a security key instead must first be activated to establish a connection with the pass word 12345678 4 In the browser address bar enter and confirm ...

Страница 36: ...the meter feed in point or con sumption point For more information on the position of the Fronius Smart Meter TS see Positioning on page 14 7 Click the Add button 8 Click the Save button to save the settings The Fronius Smart Meter TS is configured as a primary meter Configuring the Fronius Smart Meter TS as a secondary meter 1 Access the inverter website Open the web browser In the address bar of...

Страница 37: ...Operation Menu structure A graphic view of the menu structure can be found in the User Information that is sup plied as standard 37 EN ...

Страница 38: ...quency Tolerance 50 60 Hz 45 65 Hz Nominal current lb 1 A 5 A Maximum current Imax 6 A Starting current 10 mA Current transformer ratio kCT 1 1000 e g TC 800 5A kCT 160 for direct connection kCT 1 Short time overload EN IEC 62053 21 EN IEC 62053 23 5 lmax 0 5 s Self consumption current path max cur rent 0 3 W per phase Maximum value kVT x kCT 1000 CT 5A Current distortion factor in acc with EN IEC...

Страница 39: ...d auxiliary voltage Standard RS485 3 conductors Transmission Serial asynchronous Protocol Modbus RTU Addresses 1 255 Number of bits 8 Stop bit 1 Parity bit None even odd Baud rate 9600 19200 38400 bit s Response time 200 ms Insulation EN IEC 62052 11 EN IEC 62053 21 Installation category III Degree of pollution 2 Insulation voltage 4 kV RMS Impulse withstand voltage Test circuit 4 kV 1 2 60 µs Vol...

Страница 40: ... 35 mm DIN rail Housing material Noryl self extinguishing Degree of protection EN 60529 IP54 housing IP20 connections Weight 240 grams Terminals Measuring input Wire Min 1 mm max 4 mm Recommended torque max 0 6 Nm Data output Wire min 0 05 mm Recommended torque max 0 4 Nm Fronius manufac turer s warranty Detailed country specific warranty terms are available on the internet www fronius com solar w...

Страница 41: ...41 EN ...

Страница 42: ...42 ...

Страница 43: ...43 EN ...

Страница 44: ...S INTERNATIONAL GMBH Froniusstraße 1 A 4643 Pettenbach AUSTRIA contact fronius com www fronius com Under www fronius com contact you will find the addresses of all Fronius Sales Service Partners and locations ...

Отзывы: