1
Turn off the automatic circuit breaker.
2
Make sure that the DC disconnector is
in the "Off" switch setting.
Loosen the five screws of the connec-
tion area cover by rotating them 180°
to the left using a screwdriver (TX20).
Remove the connection area cover
from the device.
3
Guide the mains cable from below
through the strain-relief device on the
right side.
Remove the AC terminal.
IMPORTANT!
The ground conductor must be con-
nected with a loop so that if the strain-
relief device fails, the ground conduct-
or is disconnected last.
For more information on the strain-re-
lief device, see chapter
.
4
Strip the insulation of the single con-
ductors by 12 mm.
Select the cable cross section in ac-
cordance with the instructions in
from page
Lift to open the terminal's operating
lever and insert the stripped single
conductor into the slot provided as far
as it will go.
Then close the terminal's operating
lever until it engages.
NOTE!
Only one conductor may be connected
to each pin.
The AC cables can be connected to
the AC terminals without ferrules.
66
Содержание Primo GEN24 3.0
Страница 2: ......
Страница 7: ...Dimensions of the inverter 187 Fronius Primo GEN24 3 6 kW 189 Fronius Primo GEN24 3 6 kW 189 7 EN...
Страница 12: ...12...
Страница 13: ...General information 13...
Страница 14: ...14...
Страница 18: ...Fronius recommends testing the Internet connection on site according to the minimum requirements 18...
Страница 34: ...34...
Страница 35: ...Backup power variant PV Point OP 35...
Страница 36: ...36...
Страница 38: ...38...
Страница 39: ...Backup power variant Full Backup 39...
Страница 40: ...40...
Страница 48: ...48...
Страница 49: ...Installation 49...
Страница 50: ...50...
Страница 57: ...Do not install the inverter on the ceiling 57 EN...
Страница 101: ...Settings user interface of the in verter 101...
Страница 102: ...102...
Страница 132: ...132...
Страница 133: ...Options 133...
Страница 134: ...134...
Страница 143: ...2 Set the DC disconnector to the On switch position Switch on the auto matic circuit breaker 143 EN...
Страница 144: ...144...
Страница 145: ...Appendix 145...
Страница 146: ...146...
Страница 172: ...172...
Страница 173: ...Circuit diagrams 173...
Страница 174: ...174...
Страница 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Страница 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Страница 177: ...Fronius Primo GEN24 with two BYD Battery Box Premium HV connected in parallel Circuit Diagram 177 EN...
Страница 178: ...Fronius Primo GEN24 with three BYD Battery Box Premium HV connected in parallel Circuit Diagram 178...
Страница 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Страница 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Страница 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Страница 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Страница 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Страница 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Страница 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Страница 187: ...Dimensions of the inverter 187...
Страница 188: ...188...
Страница 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Страница 190: ...190...
Страница 191: ...191 EN...
Страница 192: ......