WARNING!
Danger due to work that has been carried out incorrectly.
This can result in serious injury and damage to property.
▶
Installing and connecting a surge protective device (SPD) must only be car-
ried out by service personnel trained by Fronius and only within the scope of
the respective technical regulations.
▶
Follow the safety rules.
AC~
OFF
1
ON
OFF
2
1
Turn off the automatic circuit breaker.
Set the DC disconnector to the "Off"
switch position.
2
Disconnect connections from the solar
module strings (+/-). Switch off the
battery connected to the inverter.
Wait for the capacitors of the inverter
to discharge (2 minutes).
Installation
CAUTION!
Risk due to insufficiently dimensioned ground conductor.
Damage to the inverter due to thermal overload can result.
▶
The national standards and guidelines must be observed for dimensioning
the ground conductor.
136
Содержание Primo GEN24 3.0
Страница 2: ......
Страница 7: ...Dimensions of the inverter 187 Fronius Primo GEN24 3 6 kW 189 Fronius Primo GEN24 3 6 kW 189 7 EN...
Страница 12: ...12...
Страница 13: ...General information 13...
Страница 14: ...14...
Страница 18: ...Fronius recommends testing the Internet connection on site according to the minimum requirements 18...
Страница 34: ...34...
Страница 35: ...Backup power variant PV Point OP 35...
Страница 36: ...36...
Страница 38: ...38...
Страница 39: ...Backup power variant Full Backup 39...
Страница 40: ...40...
Страница 48: ...48...
Страница 49: ...Installation 49...
Страница 50: ...50...
Страница 57: ...Do not install the inverter on the ceiling 57 EN...
Страница 101: ...Settings user interface of the in verter 101...
Страница 102: ...102...
Страница 132: ...132...
Страница 133: ...Options 133...
Страница 134: ...134...
Страница 143: ...2 Set the DC disconnector to the On switch position Switch on the auto matic circuit breaker 143 EN...
Страница 144: ...144...
Страница 145: ...Appendix 145...
Страница 146: ...146...
Страница 172: ...172...
Страница 173: ...Circuit diagrams 173...
Страница 174: ...174...
Страница 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Страница 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Страница 177: ...Fronius Primo GEN24 with two BYD Battery Box Premium HV connected in parallel Circuit Diagram 177 EN...
Страница 178: ...Fronius Primo GEN24 with three BYD Battery Box Premium HV connected in parallel Circuit Diagram 178...
Страница 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Страница 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Страница 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Страница 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Страница 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Страница 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Страница 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Страница 187: ...Dimensions of the inverter 187...
Страница 188: ...188...
Страница 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Страница 190: ...190...
Страница 191: ...191 EN...
Страница 192: ......