Safety and grid requirements
Country setup
The "Country setup" menu area is intended exclusively for installers/service tech-
nicians from authorised specialist companies. The access code must be reques-
ted from the national/international Fronius point of contact using an application
form.
The selected country setup for the respective country contains preset paramet-
ers according to the nationally applicable standards and requirements. Depend-
ing on local grid conditions and the specifications of the energy provider, adjust-
ments to the selected country setup may be necessary.
CAUTION!
Risk due to unauthorised access.
Incorrectly set parameters can negatively influence the public grid and/or the
feed-in of power into mains by the inverter, and lead to a loss of conformity with
the standard.
▶
The parameters may only be adjusted by installers/service technicians from
authorised specialist companies.
▶
Do not give the access code to third parties and/or unauthorised persons.
CAUTION!
Risk due to incorrectly set parameters.
Incorrectly set parameters can negatively influence the public grid and/or cause
faults and failures on the inverter, and lead to the loss of standard conformity.
▶
The parameters may only be adjusted by installers/service technicians from
authorised specialist companies.
▶
The parameters may only be adjusted if the energy provider permits or re-
quires this.
▶
Only adjust the parameters taking into account the nationally applicable
standards and/or directives and the specifications of the energy provider.
Feed-in limita-
tion
Energy companies or grid operators may stipulate feed-in limitations for an in-
verter (e.g. max. 70% of kWp or max. 5 kW).
The feed-in limitation takes account of self-consumption by the household be-
fore the power of an inverter is reduced:
-
A custom limit can be set.
-
A Fronius Smart Meter can be connected to the Modbus push-in terminal of
the data communication area at the connections M0/M1- / M0/M1+ for Mod-
bus data.
With the inverter, any PV power that is not allowed to be fed into the public grid
is used to charge the battery instead and/or used by the Fronius Ohmpilot so
that it does not go to waste. The feed-in limitation is only active if the power of
feeding in is higher than the set power reduction.
"
Off
"
The inverter converts the entire available PV power and feeds it into the public
grid.
118
Содержание Primo GEN24 3.0
Страница 2: ......
Страница 7: ...Dimensions of the inverter 187 Fronius Primo GEN24 3 6 kW 189 Fronius Primo GEN24 3 6 kW 189 7 EN...
Страница 12: ...12...
Страница 13: ...General information 13...
Страница 14: ...14...
Страница 18: ...Fronius recommends testing the Internet connection on site according to the minimum requirements 18...
Страница 34: ...34...
Страница 35: ...Backup power variant PV Point OP 35...
Страница 36: ...36...
Страница 38: ...38...
Страница 39: ...Backup power variant Full Backup 39...
Страница 40: ...40...
Страница 48: ...48...
Страница 49: ...Installation 49...
Страница 50: ...50...
Страница 57: ...Do not install the inverter on the ceiling 57 EN...
Страница 101: ...Settings user interface of the in verter 101...
Страница 102: ...102...
Страница 132: ...132...
Страница 133: ...Options 133...
Страница 134: ...134...
Страница 143: ...2 Set the DC disconnector to the On switch position Switch on the auto matic circuit breaker 143 EN...
Страница 144: ...144...
Страница 145: ...Appendix 145...
Страница 146: ...146...
Страница 172: ...172...
Страница 173: ...Circuit diagrams 173...
Страница 174: ...174...
Страница 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Страница 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Страница 177: ...Fronius Primo GEN24 with two BYD Battery Box Premium HV connected in parallel Circuit Diagram 177 EN...
Страница 178: ...Fronius Primo GEN24 with three BYD Battery Box Premium HV connected in parallel Circuit Diagram 178...
Страница 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Страница 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Страница 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Страница 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Страница 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Страница 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Страница 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Страница 187: ...Dimensions of the inverter 187...
Страница 188: ...188...
Страница 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Страница 190: ...190...
Страница 191: ...191 EN...
Страница 192: ......