Transitioning
from backup
power mode to
feeding energy
into the grid
1
.
The inverter is operating in backup power mode. The contactors K1 and K2 to
the public grid are open.
2
.
Public grid available again.
3
.
The Fronius Smart Meter monitors the grid parameters on the public grid
and passes this information to the inverter.
4
.
The stability of the returned public grid is determined by checking the meas-
ured values of the Fronius Smart Meter.
5
.
On the basis of adjustments that have been carried out, the inverter ends
backup power mode and disconnects the outputs.
6
.
The inverter deactivates K3. Power is restored to contactors K1, K2, K4 and
K5.
7
.
All circuits are reconnected to the public grid and are supplied by the grid.
The inverter does not feed anything into the grid at this time.
8
.
The inverter can start feeding energy into the grid again after performing the
grid checks required by the relevant standard.
47
EN
Содержание Primo GEN24 3.0
Страница 2: ......
Страница 7: ...Dimensions of the inverter 187 Fronius Primo GEN24 3 6 kW 189 Fronius Primo GEN24 3 6 kW 189 7 EN...
Страница 12: ...12...
Страница 13: ...General information 13...
Страница 14: ...14...
Страница 18: ...Fronius recommends testing the Internet connection on site according to the minimum requirements 18...
Страница 34: ...34...
Страница 35: ...Backup power variant PV Point OP 35...
Страница 36: ...36...
Страница 38: ...38...
Страница 39: ...Backup power variant Full Backup 39...
Страница 40: ...40...
Страница 48: ...48...
Страница 49: ...Installation 49...
Страница 50: ...50...
Страница 57: ...Do not install the inverter on the ceiling 57 EN...
Страница 101: ...Settings user interface of the in verter 101...
Страница 102: ...102...
Страница 132: ...132...
Страница 133: ...Options 133...
Страница 134: ...134...
Страница 143: ...2 Set the DC disconnector to the On switch position Switch on the auto matic circuit breaker 143 EN...
Страница 144: ...144...
Страница 145: ...Appendix 145...
Страница 146: ...146...
Страница 172: ...172...
Страница 173: ...Circuit diagrams 173...
Страница 174: ...174...
Страница 175: ...Circuit Diagram PV Point OP Circuit Diagram 175 EN...
Страница 176: ...Fronius Primo GEN24 and BYD Battery Box Premium HV Circuit Diagram 176...
Страница 177: ...Fronius Primo GEN24 with two BYD Battery Box Premium HV connected in parallel Circuit Diagram 177 EN...
Страница 178: ...Fronius Primo GEN24 with three BYD Battery Box Premium HV connected in parallel Circuit Diagram 178...
Страница 179: ...Automatic switch to backup power 1 pin double separation e g Austria Circuit Diagram 179 EN...
Страница 180: ...Automatic switch to backup power 1 pin single separation e g Australia Circuit Diagram 180...
Страница 181: ...Automatic switch to backup power 2 pin double separation e g Germany Circuit Diagram 181 EN...
Страница 182: ...Automatic switch to backup power 2 pin single separation e g France Spain Circuit Diagram 182...
Страница 183: ...Automatic switch to backup power 2 pin double separation e g UK Circuit Diagram 183 EN...
Страница 185: ...Fronius Primo GEN24 with Enwitec Box Circuit Diagram 185 EN...
Страница 186: ...Wiring diagram surge protective device SPD Circuit Diagram 186...
Страница 187: ...Dimensions of the inverter 187...
Страница 188: ...188...
Страница 189: ...Fronius Primo GEN24 3 6 kW Fronius Primo GEN24 3 6 kW 189 EN...
Страница 190: ...190...
Страница 191: ...191 EN...
Страница 192: ......