▪ During initial start-up, operating staff are shown how to use the boiler. It is impera‐
tive for proper handover of the product that those involved are present as this is a
one-off opportunity.
The individual steps for initial start-up are explained in the operating instructions for
the controller
NOTICE! See operating instructions for the SPS 4000
Commissioning
5
Heating up for the first time
Installation Instructions Turbomat TM 400-500 | M0690213_en