2.2 Qualification of assembly staff
CAUTION
Assembly and installation by untrained personnel:
Risk of personal injury and damage to property.
During assembly and installation:
❒ Observe the instructions and information in the manuals
❒ Only allow trained staff to carry out assembly and installation
Assembly, installation, initial startup and servicing must always be carried out by quali‐
fied personnel:
- Heating technician / building technician
- Electrical installation technician
- Froling customer services
The assembly staff must have read and understood the instructions in the documenta‐
tion.
2.3 Protective equipment for assembly staff
You must ensure that staff have the protective equipment specified by accident pre‐
vention regulations.
▪ For transportation, setup and assembly:
- suitable workwear
- protective gloves
- sturdy shoes
2.4 Design Information
2.4.1 Notes on standards
The system must be installed and commissioned in accordance with the local fire and
building regulations. The following standards and regulations should always be ob‐
served:
General standards for heating systems
EN 303-5
Boilers for solid fuels, manually and automatically fed combus‐
tion systems, nominal heat output up to 500 kW
EN 12828
Heating systems in buildings - design of water-based heating
systems
EN 13384-1
Chimneys - Thermal and fluid dynamic calculation methods
Part 1: Chimneys serving one appliance
2
Safety
Qualification of assembly staff
6
Fröling GesmbH | 4710 Grieskirchen, Industriestraße 12 | www.froeling.at