❒ Assemble the safety switch on the bracket
❒ Mount the safety switch and bracket onto the boiler insulation
❒ Position the ash container
➥ Push the lever on the side of the boiler downwards to lock the ash container in
place
❒ Push the key plate into the safety switch on the boiler
4.5.17 Installing the grate drive
❒ Mount the 4 nuts and spacer washers on the blind flange
❒ Remove the locking screw and fitting key from the stub shaft
❒ Grease the shaft stub
❒ Remove the transport lock from the geared motor
❒ Install the vent screw (included) at the highest point