Table of Contents
1
Overview
6
1.1
Front view
6
1.2
Back view
7
1.3
Cross-section
8
1.4
Boiler manufacture and testing
9
1.5
Wood heater description and compliance status
9
1.6
Cleaning kit provided
9
2
Safety
10
2.1
Explanation of symbols
10
2.2
Permitted Uses
11
2.3
Requirements at the place of installation
13
2.3.1
Approval for the heating system
13
2.3.2
Space required
13
2.3.3
Requirements for central heating water
14
2.3.4
Ventilation requirement for boiler room
15
2.3.5
Requirements for the heating system
15
2.3.6
Requirements for the boiler room
15
2.3.7
Combination with thermal storage
16
2.3.8
Return temperature control
16
2.3.9
Requirements for the chimney connection
17
Basic data for designing the chimney connection
17
2.4
Safety markers
18
2.4.1
Mandatory signs
18
2.4.2
Prohibitions
19
2.4.3
Warning signs
19
2.4.4
Signage on the boiler
20
Notice of risks during installation
20
Notice of risks during operation
21
Notice regarding procedures in an emergency
22
2.5
Residual risks
23
2.5.1
Basic risks
23
2.5.2
Risks from electricity
23
2.5.3
Danger from fire and explosion
24
2.5.4
Danger from high temperatures
25
2.5.5
Risks from flue gases, lubricants and other equipment
26
2.6
What to do in the case of danger
27
2.7
Staff requirements
28
2.8
Personal protective equipment
30
2.9
Replacement parts
30
2.10
Environmental protection
31
2.11
The operator's responsibilities
31
3
Description of the boiler
33
3.1
Front view
33
Table of Contents
2
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com