Checking the seal

❒ Open the door
❒ Insert a sheet of paper at both the top and the bottom between the door and the

boiler

❒ Close the door
❒ Try to pull out the sheet of paper.

➥ If the paper cannot be removed:

door is tightly sealed.

➥ If the paper can be removed:

door is not sealed properly - tighten the locking hook!

⇨ See "Positioning the burning chamber and combustion chamber door" [page

49]

 

4.6.5 Positioning the burning chamber and combustion chamber door

The example below shows how to position the burning chamber door. The procedure
is the same for checking the seal on the combustion chamber door.

❒ Loosen the nut on the locking hook
❒ Tighten or loosen the locking hook as required
❒ Fix in place using lock-nuts

 

 

 

Servicing

4

Periodic inspection and cleaning (approx. 3,000 hrs)

Operating Instructions | B1300015_en

49

Содержание Lambdamat LM 1000 SPS

Страница 1: ...al German operating instructions for the operator Read and follow the instructions and safety information Technical changes typographical errors and omissions reserved B1300015_en Edition 11 08 2015 F...

Страница 2: ...2 8 1 Overheating of the system 21 2 8 2 Smell of flue gas 22 2 8 3 Fire in the system 22 3 Operating the system 23 3 1 Assembly and initial startup 23 3 2 Filling the store space with fuel 24 3 2 1...

Страница 3: ...s recirculation FGR duct 45 4 5 5 Checking the heat exchanger 45 4 5 6 Cleaning the area under the moving grate 46 4 6 Periodic inspection and cleaning approx 3 000 hrs 47 4 6 1 Cleaning the combustio...

Страница 4: ...s with fault message 57 5 3 1 Procedure for fault messages 58 5 3 2 Acknowledging a fault message 58 6 Appendix 60 6 1 Addresses 60 6 1 1 Address of manufacturer 60 6 1 2 Address of the installer 60 T...

Страница 5: ...ronmentally friendly and economical operation of the system The constant further development of our products means that there may be minor differences from the pictures and content If you discover any...

Страница 6: ...on chamber door 16 Boiler return connection 6 Burning chamber door 17 Safety valve connection 7 Combustion air blower fan 18 Boiler flow connection 8 Ash container 300l optional 19 Flue gas recirculat...

Страница 7: ...25 Secondary air servo motor II 23 Air distribution frame of compressed air cleaner optional 26 Tertiary air servo motor 24 Primary air actuator 27 High limit thermostat STL General 1 Lambdamat LM 10...

Страница 8: ...ber 29 Burn back protection system shown here burn back flap optional rotary valve 32 Multiple pass heat exchanger 30 Moving grate 33 Cleaning door 1 General Lambdamat LM 1000 Product Overview 8 Froli...

Страница 9: ...re not observed it will lead to serious injury or death You must follow the instructions WARNING The dangerous situation may occur and if measures are not observed it will lead to serious injury or de...

Страница 10: ...g instructions Wear safety shoes Always wear protective gloves Wear hearing protection Keep the doors closed Turn off the main switch Unauthorised access prohibited No not walk on the surface Warning...

Страница 11: ...spontaneous combustion of carbonisation gases or flash fires which can in turn cause serious accidents When operating the boiler please note the following Instructions and information regarding versi...

Страница 12: ...ill then be fully responsible for the declaration of conformity according to the valid guideline s for the product and will need to attach the new CE label to the device This person will then assume a...

Страница 13: ...alve The store should be fitted with a pressure release device in accordance with regional regulations The same limits apply for the permitted water content of sawdust as for wood chips NOTICE For fue...

Страница 14: ...fined in the Permitted fuels section and particularly the burning of refuse is not permitted CAUTION In case of use of non permitted fuels Burning non permitted fuels increases the cleaning requiremen...

Страница 15: ...m and changing or deactivating safety equipment is prohibited Always comply with all fire building and electrical regulations when installing or operating the system in addition to following the opera...

Страница 16: ...ken from and expelled directly outside and the openings and air ducts should be designed to prevent weather conditions foliage snowdrifts etc from obstructing the air flow Unless otherwise specified i...

Страница 17: ...m with a storage tank as this ensures a continuous supply of fuel in the ideal output range of the boiler For the correct dimensions of the storage tank and the line insulation in accordance with NORM...

Страница 18: ...ool down 3 SAFETY OVERLOAD SWITCHES MOTOR PROTECTION SWITCHES RESIDUAL CURRENT PROTECTIVE DEVICES RCD Switch off the related component in the event of fault currents or overloads 4 SAFETY TEMPERATURE...

Страница 19: ...tor switch past the 0 position engages the locking lever The switch can be locked with a padlock to prevent it from being switched on again On completion of the maintenance work Remove the padlock Tur...

Страница 20: ...ARNING Opening the door to the combustion or burning chamber or the cleaning door or lids during operation may result in injury or damage or flue gas generation Therefore Do not open any doors or lids...

Страница 21: ...in the desired mode 2 8 Emergency procedure 2 8 1 Overheating of the system If the system overheats and the safety devices fail proceed as follows NOTICE Do not under any circumstances switch off the...

Страница 22: ...ler according to procedure Ventilate the room where the boiler is installed Close the fire door and doors to living areas 2 8 3 Fire in the system DANGER In case of fire in the system Risk of death by...

Страница 23: ...lation Installation of water pipes Flue gas connection including all insulation work Work must comply with local fire protection regulations The operator must ensure that at least 50 of the boiler s r...

Страница 24: ...The boiler follows the shutdown procedure and switches to Switched off OFF status turn off the boiler s main switch turn off the main switch on the expansion switch cabinet if installed For blowing i...

Страница 25: ...mpty the rotary agitator arms spring blades are fully extended If the rotary agitator arms spring blades are covered in this position with a large amount of fuel the weight of the fuel will stop them...

Страница 26: ...r s main switch Turn on the main switch on the expansion switch cabinet if installed Switch on the boiler by tapping Boiler on at the mode icon For the highest possible heat consumption the storage ta...

Страница 27: ...itator arms are not extended the store can be filled as follows Switch off the boiler by tapping Boiler off at the mode icon and allow to cool for at least two hours Close all openings to the store to...

Страница 28: ...hand The head of the rotary agitator should be completely covered Follow the instructions on working in the fuel store NOTICE Refer to the notice supplied with the boiler at the entrance to the store...

Страница 29: ...dumping height depending on the fuel density as specified in the operating instructions for the sliding floor must not be exceeded Driving over the fuel in the store can cause the material to be comp...

Страница 30: ...s be moved into an upright position in order to fill the store This can be done as follows If the store is filled while the boiler system is running the screw moves automatically into an upright posit...

Страница 31: ...d via the controller according to the selected mode in automatic mode For other modes press the relevant function key Information on function keys in the relevant operating instructions for the SPS 40...

Страница 32: ...shutdown procedure and switches to Switched off OFF status after the cleaning cycle Turn off the main switch Boiler controller is switched off The components powered via the control cabinet are power...

Страница 33: ...tc WARNING Inspection and cleaning work on a system which is operational Risk of serious injuries from automatic startup of the system and severe burns from hot parts and the flue gas pipe When workin...

Страница 34: ...he Technical Directive for Fire Prevention TRVB NOTICE As well as the cleaning and maintenance tasks explained in these instructions also refer to the specifications according to TRVB H 118 given in t...

Страница 35: ...rge pipe must not drip NOTICE Exception Boiler temperature 100 C If water is dripping from the discharge pipe Clean the discharge safety device in accordance with the manufacturer s instructions or ha...

Страница 36: ...nger ID fan Flue gas recirculation FGR Combustion air blower fan Burn back protection system Check function and seal Screw drives Loading and ash removal Door contact switch When the door is opened th...

Страница 37: ...OFF status 4 3 1 Emptying the combustion chamber ash container optional NOTICE The current fill level of the ash container can also be checked while the boiler is in operation Important The ash contai...

Страница 38: ...ted by the ash screws weighs approx 1kg L At least two people are therefore required to transport the ash container depending on its fill level To replace the ash container 1 Remove the coupling cap S...

Страница 39: ...precautions to prevent accidental switching on allow the boiler to cool off for at least 1 hour once all of the tasks have been completed turn the main switch back on and switch the boiler on in the...

Страница 40: ...r Cleaning the combustion chamber Open the combustion chamber door Remove unburned material and foreign bodies from the combustion chamber Using a flat scraper move the ash on the combustion chamber g...

Страница 41: ...ews in manual mode Ash that gathers is moved into the ash container Empty the ash container whenever necessary 4 3 3 Emptying the multicyclone ash container Check the ash level and empty the container...

Страница 42: ...ion air fan page 47 See Checking the underpressure controller page 51 See Checking the seal of the cleaning port doors page 47 See Checking the combustion chamber overpressure sensor page 52 See Check...

Страница 43: ...em always wear protective gloves only operate the boiler using the handles provided switch off the boiler by tapping Boiler off at the mode icon The boiler follows the shutdown procedure and switches...

Страница 44: ...rew in the broadband probe once more by hand 4 5 3 Cleaning the flue gas temperature sensor Pos C See Periodic inspection and cleaning page 42 Loosen the retaining screw and pull out the flue gas temp...

Страница 45: ...acuum 4 5 5 Checking the heat exchanger Pos E See Periodic inspection and cleaning page 42 1 Open the reversing chamber door 2 Check the heat exchanger pipes and if necessary clean thoroughly with a b...

Страница 46: ...aning cover Check the moving grate area and ash rakes for dirt and deposits Clean where necessary Check the grate grate shafts and grate bearings for wear and deformation Exchange components wherever...

Страница 47: ...ng the seal of the cleaning port doors Pos H See Periodic inspection and cleaning page 42 1 Open the reversing chamber door 2 Check that the fibre glass seal of the cleaning port doors is perfectly al...

Страница 48: ...ction and cleaning page 42 The example below of the burning chamber door shows how to check the position and seal The procedure is the same for checking the seal on the combustion chamber door NOTICE...

Страница 49: ...hook See Positioning the burning chamber and combustion chamber door page 49 4 6 5 Positioning the burning chamber and combustion chamber door The example below shows how to position the burning cham...

Страница 50: ...lly remove the combustion chamber temperature sensor if necessary clean carefully When all tasks have been completed replace the combustion chamber temperature sensor 1 Open the reversing chamber door...

Страница 51: ...ls with the flat scraper 7 Check the fireclay elements for wear 8 Remove any ash which has gathered 9 Close all doors again 4 6 7 Checking the underpressure controller Pos L See Periodic inspection an...

Страница 52: ...with a fine cloth Check that the spacer tube is clear Insert the combustion chamber excess pressure sensor and fix loosely with fixing screws 4 6 9 Cleaning the FGR blower fan Pos N See Periodic inspe...

Страница 53: ...he running wheel and coil of the induced draught fan with a brush 4 6 11 Lubricating the bearings Grease the bearings of the screws and the drives at the correct points 4 6 12 Checking the flue gas pi...

Страница 54: ...000 or yearly Change the oil Change the return filter and the vent filter sets Recommended procedure for oil change Move all hydraulic cylinders to the end stop This will expel all the oil Drain off o...

Страница 55: ...the course of this maintenance the entire system is inspected and optimised particularly regulation and control of the boiler The emission measurement carried out can also be used to draw conclusions...

Страница 56: ...sure that the system is disposed of in an environmentally friendly way in accordance with waste management regulations You can separate and clean recyclable materials and send them to a recycling cent...

Страница 57: ...ording to the specified program After a power failure check whether the STL high limit thermostat has tripped Keep the doors of the boiler closed during and after the power failure at least until the...

Страница 58: ...the option of resolving the error quickly to prevent a shutdown ERROR ORANGE warning sign Message with ORANGE background The boiler follows the shutdown procedure and remains in Switched off OFF statu...

Страница 59: ...is indicated by an arrow symbol 2 Acknowledge the current fault by tapping the check mark 3 A symbol 4 appears once the fault has been acknowledged Once all faults have been fixed and acknowledged al...

Страница 60: ...und Beh lterbau GesmbH Industriestra e 12 A 4710 Grieskirchen AUSTRIA TEL 0043 0 7248 606 0 FAX 0043 0 7248 606 600 INTERNET www froeling com 6 1 2 Address of the installer Stamp 6 Appendix Addresses...

Отзывы: