11.2 Digital display of main board

The data display area is divided into Up area and Down area, 

with two groups of two-digit half 7-segment digital display, 

respectively.

a. Temperature display

Temperature display is used for displaying the total outlet 

water temperature of unit system, outlet water temperature, 

condenser pipe temperature T3A of system A, condenser 

pipe temperature T3B of system B, outdoor environmental 

temperature T4,

anti-freezing temperature T6 and setting temperature Ts, with 

allowable data display scope -15°C~70°C. If the temperature 

is higher than 70°C, it is displayed as 70°C. If there is no 

effective date, it displays “— —” and indication point 

°C

 is on.

b. Current display

Current display is used for displaying Modular unit system A 

compressor current IA or system B compressor current IB, 

with allowable display scope 0A~99A. If it is higher than 99A, 

it is displayed as 99A. If there is no effective date, it displays 

“— —” and indication point 

A

 is on.

c. Failure display

It is used for displaying the total failure warning date of unit 

or that of Modular unit, with failure display scope E0~EF, E 

indicating failure, 0~F indicating failure code. “E-“ is displayed 

when there is no failure and indication point 

#

 is on at the 

same time.

d. Protection display

It is used for displaying the total system protection data of unit 

or the system protection data of Modular unit, with protection 

display scope P0~PF, P indicating system protection, 0~F 

indicating protection code. “P-“ is displayed when there is no 

failure.

e. Unit number display

It is used for displaying the address number of the currently 

selected Modular unit, with display scope 0~15 and indication 

point 

is on at the same time.

f. Display of online unit number and startup unit number

They are used for displaying the total online Modular units 

of the whole unit system and the number of the Modular unit 

under running state, respectively, with display scope 0~16.

Any time when the spot check page is entered to display 

or change Modular unit, it is needed to wait for the up-to-

date data of the Modular unit received and selected by wired 

controller. Before receiving the data, the wired controller only 

displays “——” on the data display Down area, and the Up 

area displays the address number of the Modular unit. No 

page can be turned, which continues until the wired controller 

receives the communication data of this Modular unit.

11.3 Care and maintenance

1) Maintenance period

It's recommended that before cooling in summer and heating 

in winter every year, consult local air conditioner customer 

service center to check and maintain the unit, to prevent air 

conditioner errors which bring inconvenience to your life and 

work.

2) Maintenance of main parts

Close attention should be paid to the discharge and suction 

pressure during the running process. Find out reasons and 

eliminate the failure if abnormality is found.
Control and protect the equipment. See to it that no random 

adjustment be made on the set points on site.
Regularly check whether the electric connection is loose, 

and whether there is bad contact at the contact point caused 

by oxidation and debris etc., and take timely measures if 

necessary.
Frequently check the work voltage, current and phase 

balance.
Check the reliability of the electric elements in time. 

Ineffective and unreliable elements should be replaced in 

time.

11.4 Removing scale

After long-time operation, calcium oxide or other minerals will 

be settled in the heat transfer surface of the water-side heat 

exchanger. These substances will affect the heat transfer 

performance when there is too much scale in the heat 

transfer surface.
and sequentially cause that electricity consumption increases 

and the discharge pressure is too high (or suction pressure 

too low). Organic acids such as formic acid, citric acid and 

acetic acid may be used to clean the scale. But in no way 

should cleaning agent containing fluoroacetic acid or fluoride 

should be used as the water-side heat exchange is made 

from stainless steel and is easy to be eroded to cause 

refrigerant leakage. Pay attention to the following aspects 

during the cleaning and scale-removing process:
1) Water-side heat exchanger should be done be 

professionals. Please contact the local air-conditioner 

customer service center.
2) Clean the pipe and heat exchanger with clean water after 

cleaning agent is used. Conduct water treatment to prevent 

water system from being eroded or re-absorption of scale.
3) In case of using cleaning agent, adjust the density of the 

agent, cleaning time and temperature according to the scale 

settlement condition.
4) After pickling is completed, neutralization treatment needs 

to be done on the waste liquid. Contact relevant company for 

treating the treated waste liquid.
5) Protection equipments (such as goggles, gloves, mask 

and shoes) must be used during the cleaning process to 

avoid breathing in or contacting the agent as the cleaning 

agent and neutralization agent is corrosive to eyes, skins and 

nasal mucosa.

11.5 Winter shutdown

For shutdown in winter, the surface of the unit outside and 

inside should be cleaned and dried. Cover the unit to prevent 

dust. Open discharge water valve to discharge the stored 

water in the clean water system to prevent freezing accident (it 

is preferable to inject antifreezer in the pipe).

11.6 Replacing parts

Parts to be replaced should be the ones provided by our 

company.
Never replace any part with different part.

Содержание Kaysun KEM-30 DRS4

Страница 1: ...you very much for purchasing our air conditioner Before using your air conditioner please read this manual carefully and keep it for future reference KEM 30 DRS4 KEM 60 DRS4 OWNER S INSTALLATION MANU...

Страница 2: ...on 08 6 4 Installation of damping devices 08 6 5 Installation of device to prevent snow build up and strong breeze 09 7 CONNECTION DRAWING OF PIPELINE SYSTEM 10 8 OVERVIEW OF THE UNIT 8 1 Main parts o...

Страница 3: ...irst startup after shutdown 33 11 8 Refrigeration system 33 11 9 Disassembling compressor 33 11 10 Auxiliary electric heater 33 11 11 System antifreezing 33 11 12 Replacement of safety valve 34 11 13...

Страница 4: ......

Страница 5: ...power supply is 380 415V 3N 50Hz the minimum allowable voltage is 342V and the maximum voltage is 456V 2 To maintain better performance please operate the unit under the following outdoor temperature...

Страница 6: ...s also used to alert against unsafe practices Indicates situations that could only result in accidental equipment or property damage Explanation of symbols displayed on the indoor unit or outdoor unit...

Страница 7: ...ls electric shocks or fire After completing the installation work check to make sure that there is no refrigerant leakage Never directly touch any leaking refrigerant as it could cause severe frostbit...

Страница 8: ...ans in accordance with national wiring regulation and this circuit diagram An all pole disconnection device which has at least 3mm separation distance in all pole and a residual current device RCD wit...

Страница 9: ...and copper pipes 4 If the unit is within the reach of unauthorized personnel take protective measures for safety considerations such as installing a fence These measures can prevent man caused or acci...

Страница 10: ...ine dimensional of KEM 30 DRS4 6 1 2 KEM 60 DRS4 B Left view Front view E D F A C Top view Fig 6 2 Outline dimensional of KEM 60 DRS4 Table 6 1 Model KEM 30 DRS4 KEM 60 DRS4 A 1870 2220 B 1000 1325 C...

Страница 11: ...rsian blinds are required the total loss of static pressure should be less than the static pressure outside the fan The space between the unit and sunk fence or Persian blinds should also meet the req...

Страница 12: ...is directed away from roadways and footpaths especially in locations where the climate is such that condensate may freeze unit mm Drainage channel Anchor bolt Inlet and outlet pipe side Electric cont...

Страница 13: ...w 1 Measures to prevent build up of snow The base height should be as least the same as the predicted snow depth in the local area Outdoor unit Base height Fig 6 10 Snow prevention base height 2 Light...

Страница 14: ...ain valve Two way valve Three way valve Terminal Auxiliary electric heater unit unit Y type filter requiring 40 meshes unit Fig 7 1 Connection drawing of pipeline system 8 OVERVIEW OF THE UNIT 8 1 Mai...

Страница 15: ...r 1 Door 2 Door 3 Door 4 Fig 8 3 Doors of KEM 30 DRS4 Door 1 give access to the compartment of water pipes and water side heat exchanger Door 2 3 4 give access to the hydraulic compartment and electri...

Страница 16: ...sure switch 28 Fast oil return solenoid valve 7 Oil separator 29 Low pressure switch 8 4 way valve 30 Filter 9 System pressure sensor 31 Capillary 10 DC fan 32 Outdoor ambient temperature sensor 11 Co...

Страница 17: ...erature control switch 1 33 Suction temperature sensor 8 Discharge temperature control switch 2 34 Low pressure switch 9 One way valve1 35 Filter 10 One way valve2 36 Capillary 11 High pressure switch...

Страница 18: ...ted only in the early period after the power supply is connected and they are not detected while the unit is in operation 2 CN12 Quick return oil solenoid valve 3 CN5 EVA HEAT Water side heat exchange...

Страница 19: ...erature sensor of the condenser T5 water tank temperature sensor T6A Refrigerant inlet temperature of EVI plate heat exchanger T6B Refrigerant inlet temperature of EVI plate heat exchanger 24 CN16 Sys...

Страница 20: ...ntrol valid for S12 2 ON S12 3 Normal cooling mode valid for S12 3 OFF factory default Low temperature cooling valid for S12 3 ON 41 CN7 TEMP SW Target water temperature switching port 42 ENC2 POWER D...

Страница 21: ...nnecting the power supply Please carefully read the labels on the electric cabinet The user s attempt to repair the controller is prohibited since improper repair may cause electric shock damages to t...

Страница 22: ...Electrical wiring precaution c d Power wiring must be entrusted to professionals with electrician qualification Fig 8 9 4 Electrical wiring precaution d 8 5 5 Power supply specification Table 8 6 Ite...

Страница 23: ...current Grounding 3 Grounding 2 Grounding 1 Grounding wire Lightning arrester Power distribution transformer Manual switch Fuses Power 380 415V 3N 50Hz Unit Fig 8 10 Requirements of power supply wirin...

Страница 24: ...to monitor the state of com pressor When the compressor is operating the light will be powered on The wiring of water pump and pipeline auxiliary heater and ac light of the state of compressor is as...

Страница 25: ...o the ALARM ports of the module units as follows electric control box ALARM port Device provided by user Fig 8 16 Wiring of ALARM port If the unit is operating unnormally the ALARM port is closed othe...

Страница 26: ...ry heater according to the actual parameter of products and national Contactor Contactor Power Transformer AC220 240V AC 8 5 V CN2 CN60 IRU SLSHOLQH CN74 CN61 0 1 21752 5 21752 5 CN60 CN74 CN61 5 5 5...

Страница 27: ...0V AC 8 5 V CN2 CN60 IRU SLSHOLQH CN74 CN61 0 1 21752 5 21752 5 CN60 CN74 CN61 5 5 5 5 021 725 5 21752 5 CN60 CN74 CN61 5 5 5 5 021 725 5 21752 5 7 7 20 7 X Y X Y X Y 203 67 7 3803 1 CN83 7 CN30 7 7 C...

Страница 28: ...chased by the user k All low positions of the water system should be provided with drainage ports to drain water in the evaporator and the system completely and all high positions should be supplied w...

Страница 29: ...c 1 1 4 KEM 60 DRS4 Hoop connection DN50 Fig 8 20 connection mode of KEM 30 DRS4 pipe Fig 8 21 connection mode of KEM 60 DRS4 pipe 8 6 3 Design of the store tank in the system kW is the unit for cooli...

Страница 30: ...water resistance h2 Pump water resistance h3 Water resistance of the longest water loop distance includes pipe resistance different valve s resistance flexible pipe resistance pipe elbow and three way...

Страница 31: ...24 Installation of multi module no more than 16 modules 2 Table of diameter parameters of main inlet and outlet pipes Table 8 10 Cooling capacity Total inlet and outlet water pipe inside nominal diam...

Страница 32: ...up at low outdoor ambient temperatures During initial start up and when water temperature is low it is important that the water is heated gradually Failure to do so may result in concrete floors crack...

Страница 33: ...a fault code If a fault occurs remove the fault first and start the unit according to the operating method in the unit control instruction after determining that there is no fault existing in the unit...

Страница 34: ...A system discharge temperature sensorfailure Recovered upon error recovery 2Ed B system discharge temperature sensor failure Recovered upon error recovery 16 EF Unit water return temperature sensor fa...

Страница 35: ...system B 68 F7 Not insert electronic expansion valve Recovered by power off 70 xF9 Inverter module temperature sensor error x 1 means Tfin1 x 2 means Tfin2 72 Fb Pressure sensor error Recovered upon...

Страница 36: ...nt air conditioner errors which bring inconvenience to your life and work 2 Maintenance of main parts Close attention should be paid to the discharge and suction pressure during the running process Fi...

Страница 37: ...d water circulate and start up unit and make the low pressure control switch short circuit if necessary Slowly inject refrigerant into the system and check suction and discharge pressure 11 9 Disassem...

Страница 38: ...et of safty valve 7 8 UNF Fig 11 1 Replacement of safety valve WARNING The air outlet of safety valve must be connected to the appropriate pipe which can direct the leaking refrigerant to the appropri...

Страница 39: ...ately ventilated before breaking into the system or conducting any hot work A degree of ventilation shall continue during the period that the work is carried out The ventilation should safely disperse...

Страница 40: ...detection fluids are suitable for use with most refrigerants but the use of detergents containing chlorine shall be avoided as the chlorine may react with the refrigerant and corrode the copper pipe...

Страница 41: ...oning it is recommended good practice that all refrigerants are removed safely When transferring refrigerant into cylinders ensure that only appropriate refrigerant recovery cylinders are employed Ens...

Страница 42: ...pressure 5 Check running current 6 Whether unit has been through refrigerant leakage test 7 Whether there is noise on all the panels ofunit 8 Check whether the main power source connection iscorrect R...

Страница 43: ...ressure switch freeze proof device water flow volume controller Overcurrent device power phase sequence device etc Refrigerant Type R 32 Water pipe system Charging volume kg 7 9 14 0 Waterflow volume...

Страница 44: ...0 Tj 25 C Pdc 13 15 kW Tj 25 C EERd 5 35 Tj 20 C Pdc 6 58 kW Tj 20 C EERd 6 90 Degradation co efficient for chillers Cdc 0 90 Power consumption in modes other than active mode Off mode POFF 0 02 kW Cr...

Страница 45: ...3 86 kW Tj 25 C EERd 4 50 Tj 20 C Pdc 11 72 kW Tj 20 C EERd 5 04 Degradation co efficient for chillers Cdc 0 9 Power consumption in modes other than active mode Off mode POFF 0 030 kW Crankcase heater...

Страница 46: ...operating limit temperature WTOL C Cycling interval capacity for heating at Tj 2 C Pcych kW Cycling interval efficiency at Tj 7 C COPcyc Degradation coefficient 4 at T 2 C Cdh Cycling interval capacit...

Страница 47: ...t T 7 C Cdh Heating water operating limit temperature WTOL C Cycling interval capacity for heating at Tj 2 C Pcych kW Degradation coefficient 4 at T 2 C Cdh Cycling interval efficiency at Tj 7 C COPcy...

Страница 48: ......

Отзывы: