38
PB
INSTALLATION
Leak Check, Evacuation, and Charging (Triple Evacuation)
WAIT
EVACUATE
BREAK VACUUM WITH DRY NITROGEN
CHARGE SYSTEM
EVACUATE
WAIT
EVACUATE
CHECK FOR TIGHT, DRY SYSTEM
(IF IT HOLDS A VACUUM)
BREAK VACUUM WITH DRY NITROGEN
Capacity
(Btu/h)
Pipe Size
Standard
Length (ft)
Max.
Elevation
B (ft)
Max. Length
A (ft)
Additional
Refrigerant
(oz/ft)
LIQUID
GAS
9k-12
1/4"(Ø6.35)
3/8"(Ø9.52)
25
33
50
.22
18k
1/4"(Ø6.35)
1/2"(Ø12.7)
25
33
66
.22
24k-36k
3/8"(Ø9.52)
5/8"(Ø15.88)
25
33
66
.32
Fig. 437
Fig. 436
Содержание Floating Air Pro-Premiere FPHFW18A3A
Страница 25: ...25 INSTALLATION Installation Dimension Diagram Figure 401 ...
Страница 26: ...26 INSTALLATION Main Tools For Installation and Maintenance Figure 402 ...
Страница 34: ...34 INSTALLATION Install Outdoor Unit Fig 431 ...
Страница 35: ...35 INSTALLATION Outdoor Units ...
Страница 40: ...40 MAINTENANCE Fig 501 ...
Страница 59: ...59 TROUBLESHOOTING Error Code 13 Fig 708 Error Code 8 ...
Страница 62: ...62 TROUBLESHOOTING Error Code 20 DC fan motor test point Fig 711 ...
Страница 68: ...68 Fig 716 TROUBLESHOOTING Error Code 36 ...
Страница 73: ...73 COMPONENTS TESTING Fan Motor ...
Страница 87: ...87 WIRING DIAGRAMS Outdoor Units Figure 805 9 36K Outdoor Units ...