37
PB
INSTALLATION
Leak Check, Evacuation, and Charging (Triple Evacuation)
Friedrich requires all installations are Leak Checked and Evacuated in accordance to the “triple evacuation” process. This
process promotes a dry tight refrigeration system before opening the service valves. It recommended that a single port
refrigeration manifold and hoses rated over 31.5psi be used. Refrigeration hose valves, along with a vacuum pump and
micron gauge, must be used to ensure the system can be vacuumed and held under 500 microns. Check all equipment and
hoses for proper usage and leaks before beginning.
1. 1st Nitrogen Pressure Test:
Ensure all refrigeration connections are properly flared, secured, and torqued to their respective settings.
Pressurize the system with nitrogen to 550psi. Soap all connections with an approved refrigerant leak detection
solution.
The pressure in the system must hold for one hour respective to the environmental conditions and should not vary
less than 540psi. If pressure can not be adequate held, check integrity of flares and torque specifications. Once
pressure is held adequately, purge the nitrogen charge to system pressure of 5-10psi. DO NOT RETURN TO
ATMOSPHERIC PRESSURE.
2. 1st Vacuum Micron Test:
Connect hoses and vacuum pump to the outdoor unit as shown in Fig. 436. Start the vacuum pump and vacuum to
1000 microns. Close the valve to the vacuum pump and check for micron rise for 15 minutes. If microns rise to near
atmospheric pressure, there is a potential leak; repeat step 1. If microns rise over 5000, the system is very wet and
will require further nitrogen purges.
3. 2nd Nitrogen Break:
Once the system holds below 5000 microns, reconnect the nitrogen tank break the system vacuum with 30-50psi of
nitrogen. Wait 5 minutes, then purge to 5-10psi. DO NOT RETURN TO ATMOSPHERIC PRESSURE.
4. 2nd Vacuum Micron Test:
Reconnect vacuum pump and gauge and begin evacuation. Vacuum system to 500 microns. Close vacuum valve
and check for micron rise. Vacuum should hold under 1000 microns. Repeat steps 3 and 4 until achieved.
5. 3rd Nitrogen Break:
Once the system holds below 1000 microns, reconnect the nitrogen tank break the system vacuum with 30-50psi of
nitrogen. Wait 5 minutes, then purge to 5-10psi. DO NOT RETURN TO ATMOSPHERIC PRESSURE.
6. 3rd Final Vacuum Micron Test:
Reconnect vacuum pump and gauge and begin evacuation. Vacuum system to 300 microns. Close vacuum valve
and check for micron rise. Vacuum should hold under 500 microns. Repeat steps 3 and 4 until achieved. Once held
under 500 microns, the system is considered dry and tight.
7. Charging the system:
Unscrew Service Valve Caps to expose the inner hexagon head. Use an allen-head spanner or service wrench with
appropriate adapter to release the refrigerant into the system. If the calculated line set length is over 24.5 ft, weight
in the additional charge with an approved refrigerant scale as needed. Refer to fig. 437.
Содержание Floating Air Pro-Premiere FPHFW18A3A
Страница 25: ...25 INSTALLATION Installation Dimension Diagram Figure 401 ...
Страница 26: ...26 INSTALLATION Main Tools For Installation and Maintenance Figure 402 ...
Страница 34: ...34 INSTALLATION Install Outdoor Unit Fig 431 ...
Страница 35: ...35 INSTALLATION Outdoor Units ...
Страница 40: ...40 MAINTENANCE Fig 501 ...
Страница 59: ...59 TROUBLESHOOTING Error Code 13 Fig 708 Error Code 8 ...
Страница 62: ...62 TROUBLESHOOTING Error Code 20 DC fan motor test point Fig 711 ...
Страница 68: ...68 Fig 716 TROUBLESHOOTING Error Code 36 ...
Страница 73: ...73 COMPONENTS TESTING Fan Motor ...
Страница 87: ...87 WIRING DIAGRAMS Outdoor Units Figure 805 9 36K Outdoor Units ...