![Freedom Won LiTE Business 40/32 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/freedom-won/lite-business-40-32/lite-business-40-32_installation-manual_2329979012.webp)
Freedom LiTE Installation Manual Revision 14
P a g e
11 | 30
Caution:
1.
Great care must be taken to ensure that the Rawl Bolt has properly located into the
narrowed section of the mounting hole before removing the support.
2.
Handle the Freedom LiTE with great care when lifting and manoeuvring. It should
remain either lying flat on its back, or vertically upright (it should not be placed
upside down or on its front face.
3.
Do not allow the pallet jack to tilt forward with the weight too far to the front.
4.
Take care not to knock any of the protruding items against obstacles during handling
such as the DC cabling and plugs and the circuit breaker handle.
5.
Take care not to scratch the LiTE during handling. Packaging foam should be used to
protect the paint when being handled on a trolley or pallet jack.
6.
Always ensure that lifting equipment and slings are adequately rated for the lifting
weight.
7.
Ensure that the eye bolts are fully screwed into the hard point thread on the top of
the unit before lifting.
8.
Wear personal protective equipment such as safety shoes and gloves while handling
and mounting the Freedom LiTE
9.
Always ensure that you have enough people on hand to perform the operation safely,
i.e., at least one person to guide and stabilise and one person to hoist or handle the
pallet jack or gantry.
10.
The gantry can be configured for wall mounting
–
when using the gantry in this
configuration absolute care must be taken to prevent the gantry from being pulled
over by non-vertical tension on the rope.
Mounting and Environmental Requirements
The LiTE Home and Business models are designed strictly for indoor use away from moisture
and direct sunlight.
No specific venting is required since the LiTE emits no hazardous gases, however air
circulation may be required to ensure room temperature is maintained at reasonable levels,
preferably below 25
˚
C (
see LiTE warranty for information on upper temperature limits for
hot environments
).
Room heating may be required in cold climates to keep the room above 0
˚
C, since charging
of the LiTE is not permitted below 0
˚
C. Ambient environments that regularly exceed 30
˚
C
should employ room cooling if practicable to ensure optimal LiTE service life.
The LiTE may be mounted directly against a wall or on the floor. There is no minimum
requirement for spacing around the battery from other objects provided that these objects
do not generate heat, corrosive gases, or moisture, and that the vents on the sides of the
battery are not blocked. Note however that access is required to the USB programming port
on the left side, and the CAN Bus plug sockets and cable exits on the right side.