FPI P36D Zero Clearance Direct Vent Gas Fireplace
59
PALACE SERIES OPTIONS
THE BALMORAL FRONT INSTALLATION
6) For optional fan installation, see page 60.
7) For 2-panel & 3-panel door installation, see page 61.
1) Bend tabs located at the back of the Balmoral Front upwards 90
degrees.
Bend tab
upwards 90
degrees.
Backside of Front shown.
2) Secure the bottom frame of the Front by loosening the inner screw
on the hinge brackets on both the left and right side of the firebox.
Slide frame in place and secure.
Left Side Shown
Hinge bracket on
bottom of firebox
4) Remove existing control switch box from under firebox by discon-
necting wires connected to the valve at TH-TH/TP terminals and
discard.
Wires connected to Valve.
Control Box
3) Slide tabs into louver brackets located on the inside top of the firebox.
Tabs
Bracket inside
top of firebox.
Balmoral Front
frame
5) Connect the ON/OFF switch wires coming from the left side of the
Front to the valve, with black hooked up to the TH/TP terminal and red
hooked up to the TH terminal.
NOTE: If fan option is not used please see step (5) of optional fan
installation for placement of fan control box.
Valve
ON/OFF Switch
Wires
Fan Control Box
Содержание P36D-LP
Страница 6: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 6 UNIT DIMENSIONS...
Страница 46: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 46 FLUSH BAY DOOR OPTIONS...
Страница 53: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 53 CAST FACEPLATE...
Страница 62: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 62 REPLACEMENT PARTS LIST...