FPI P36D Zero Clearance Direct Vent Gas Fireplace
51
A non-combustible material 12” (305mm) above the Arch and 6”
(153mm) on each side must be used. The Arch Screen Front also
requires steel stud framing above and on each side of the unit (refer
to
Diagram 1).
Diagram 1
Framing & Finishing
Note:
The facing material has to go on after the unit is set.
1) Remove Glass Door. Refer to P36 Manual.
2) Remove 2 screws and bracket as indicated.
3) Install On/Off switch.
4) Place bracket under the Flange. Secure with 2 screws as indicated
in Diagram 4.
Diagram 2
Diagram 3
Diagram 4
5) Loosen the 3 x #8 Phillips Head Screws located on the inside top
of the outer frame of the appliance.
Remove bracket
Remove both screws
On/Off Switch
Control
Mounting
Bracket
3 x #8 Phillips
ARCH SCREEN DOOR INSTALLATION
REGENCY OPTIONSIONS
Содержание P36D-LP
Страница 6: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 6 UNIT DIMENSIONS...
Страница 46: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 46 FLUSH BAY DOOR OPTIONS...
Страница 53: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 53 CAST FACEPLATE...
Страница 62: ...FPI P36D Zero Clearance Direct Vent Gas Fireplace 62 REPLACEMENT PARTS LIST...