background image

FPI FP90 Wood Fireplace

17

INST

ALLA

TION

Flex Vent

Discharge

Vent Grille

Discharge Vent  
Frame

Connecting
Collar

Clamp

Flex
Vent

Insulation 
Strips

1)

  Remove the screw from the vent hole cover 

(vent cover 'A') on top of the unit.

2)

  Take the connector collar and press and 

rotate it into the hole to cut through the 
insulation layer. Remove the collar and 
remove insulation from the collar. The screws 
for the inner cover should be exposed.

3)

  Remove the screws from the inner cover 

(vent cover 'B') and slide it back under the 
insulation.

4)

  Extend fl ex vent and pull the insulation 

sleeves over the 8” (203mm) diameter fl ex 
vents. Leave a short section of fl ex vent 
exposed at each end. On one end insert the 
collar into the fl ex vent and use a clamp to 
hold the fl ex vent in place.

5)

  Use tin snips to cut slits into the rim of the 

connector collar. A minimum of four tabs 
will be required so cut the slits 1” (25mm) 
(i.e. 1” (25mm) wide tabs) apart around the 
perimeter of the collar. 

6)

  Install the connecting collar into the top of 

the unit until the bead of the collar rests 
against the top of the inner top of the unit. 
Reach inside the upper louver opening 
and use pliers to bend the tabs (minimum 
4) out on the connector collar.  A  hammer 
may be required to lightly tap the tabs and 
bend them so that they fi t tightly against the 
bottom of the inner top. Pull the insulation 
sleeve down to the top of the unit. Repeat 
steps 1-6 for the second fl ex vent and collar 
assembly. 

7)

  Position the vent frames for the Discharge 

Grilles into the rough opening of the stud 
wall framing. Make sure to add two insulation 
strips behind the fl anges of the frame prior to 
securing to wall. The frames will fi t between 
studs framed at 16” (406mm) on center. Use 
4 nails or screws to mount the frame to the 
stud framing.

Completing The Facing

Facing materials must be thin veneer (non-self 
supporting facades) or self supporting facades.  
If you are installing a thin veneer facade the 
Regency Masonry Retainer Kit  is recommended. 
All facades must be 

Non-Combustible

 such 

as brick, rock or ceramic tile. See Clearance to 
Combustible diagram at the beginning of this 
manual to determine the extent to which you 
must use non-combustible materials. Gypsum 
wallboard is not non-combustible.

Non-self Supporting, Thin Veneer 

Facades Installation

1) 

Install heavy expanded metal only on the 
top half of the fi replace using a drill to pre-
drill holes and install using tap screws at 
locations as indicated on kit.

2) 

Install metal edging of kit on each side of 
the doors making sure the edges fi t nicely 
with the arch edge above.

3) 

Cover the rest of the area with wire mesh 
or metal lath, overlapping around the heavy 
expanded metal.  Make sure nails or staples 
used for fastening mesh penetrate studs at 
least 1" (25mm).

4) 

Mortar must be "thin set" or "thin bed" type 
inherently polymer modifi ed.  If not modifi ed, 
you should add a synthetic latex additive. 
Mix to a fi rm, moist consistency. Using a 
plasterer's or mason's trowel apply mortar 
1/2" (13mm) to 3/4" (19mm) thick to prepared 
surface area. Do not spread more than a 
workable area so that the mortar will not 
set up before stone or brick is applied.

Note: Remove the fireplace doors and 

louvers and store them in a safe place 
until all the masonry work is fi nished.  
Acid from the cleaning operation will 
permanently damage gold plating.

5) 

If additional mortar is required, use a grout 
bag to fi ll in joints. Care must be taken to 
avoid smearing on the surface of stone or 
brick.  Accidental smears should be removed 
only after mortar has become crumbly, using 
a whisk broom or dry bristle brush.  Do not 
use a wet brush or a wire brush.

6) 

When mortar joints have become fi rm 
(thumb-print dry) they should be pointed 
up with a wood stick or metal jointing tool.

FINISHING THE 

REGENCY FP90

INSTALLATION

8)

  Insert the connecting collar into the other 

end of the 5 ft. (1.5m) fl ex vent and use an 
adjustable clamp to hold the vent in place. 
Cut tabs into the rim of the connector collar 
(a minimum of 4 tabs will be required). Push 
the collar through the 8” (203mm) hole in 
the mounting frame. Use pliers to bend out 
tabs (minimum 4) to secure the collar to the 
mounting frame.

9)

  Pull the insulation sleeve up the fl ex vent 

to the back of the mounting frame. The fl ex 
vent should now be connected to both the 
unit and the mounting frames securely. 
Repeat steps 1-8 for the second fl ex vent 
assembly.

10)

 Install the block-off plate to the unit. The 

block-off plate will cover the upper louver 
opening of the unit and force the fan air 
to circulate through the two 8” (203mm) 
diameter fl ex vents. Put high temperature 
sealant onto the block-off plate. Mount the 
block-off plate onto the front of the unit and 
cover the upper louver opening. Make sure 
that all exposed holes in the block-off plate 
are sealed with high temperature sealant.

NOTE:

Make sure the block-off plate is fl ush and 
fastened tightly to the Regency FP90 
Fireplace.

11)

 The rough opening size for the Chase Vent 

Grille is 3” H x 10”W (76mm H x 254mm 
W). 

WARNING:

A chase vent of 30 sq. inches (194 cm

2

MUST be installed in all applications, 
otherwise serious overheating of the chase 
may result. Use the chase vent supplied 
with the FP90 unit only or any equivalent 
one with the same or less restriction of air 
fl ow (for U.S. installations only).

12)

 Recheck all fl ex vent-work connections to 

make sure that they are secure. Install wall 
sheathing and cut-out openings for the chase 
ventilation, and hot air discharge outlets.

13)

 Install the Chase Vent Grille and install 

the Discharge Vent Grilles for the hot air 
outlets.

NOTE:

There must be a minimum of 5" (127mm) 
between the gravity air vents.

Содержание FP90

Страница 1: ...d by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Please keep these instructions for future reference Regency High Ef ciency EPA Certi ed...

Страница 2: ...of trouble free enjoyment This product has been certi ed by the Environmental Protection Agency of the United States This means that it meets the strictest standards in providing you with the latest...

Страница 3: ...n self Supporting Thin Veneer Facades Installation 17 Masonry Retainer Kit Option 18 Finishing Details 19 Completing The Mantle 19 Masonry Liner Bricks 20 Secondary Air Tube Installation 20 Glass Inst...

Страница 4: ...each Regency Fireplace It is located inside the lower louver opening on the left side We have printed a copy of the contents here for your review SAFETY LABEL NOTE Regency units are constantly being i...

Страница 5: ...eight 570 lbs 259kg Options Ashdrawer R90 EX90 Fan R90 EX90 Surround Black EX90 Surround Polished Gold EX90 Surround Antique Nickel EX90 Louver Flush Black R90 Louver Flush Black Gold R90 Louver Flush...

Страница 6: ...PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCE IMPORTANT Please read and follow these rules for safety 1 Before starting your replace installation read these installation instructions carefully to be...

Страница 7: ...s replace system is designed for installation in accordance with the National Fire Protection Standard for chimneys replaces and solid fuel burningappliances NFPA211andin accordance with codes such as...

Страница 8: ...he front and facing of the replace and nearby walls WARNING If insulation is used do not place the unit against it Insulation or vapor barriers if used must be secured to assure insulation and vapor b...

Страница 9: ...the front of the unit supporting the header The enclosure walls can be framed using any suitable material 2x4 2x6 studs plywood gyproc etc Normally framing will be set back to allow Non Combustible Ma...

Страница 10: ...ed to elevate the replace above the oor a Z type safety strip should be fabricated from 20 gauge galvanized sheet steel and used to protect the front surface of the wood support as well as the oor ben...

Страница 11: ...ed when installing the replace Do not alter or mix parts from other systems as this may cause a potential hazard and void Regency s limited warranty Chimney Height Thetotalheightofyourchimneysystemfro...

Страница 12: ...E MIN 10 254mm 84 2134mm CEILING NOTES 1 CHASE MUST BE 60 1524mm WIDE INSIDE AND UNIT TO BE CENTERED IN OPENING 2 MANTEL MIN HEIGHT OF 18 457mm FROM TOP OF LOUVER OPENING TO UNDERNEATH MANTEL or 55 1...

Страница 13: ...required at each oor penetration See Table 1 page 15 Check chimney manufacturer s framing opening sizes to allow for correct clearances All parts must be listed 4 Theroof ashingshouldbeinstalledmaking...

Страница 14: ...e House When there is no re in your unit there still should be suf cient draft to draw smoke from a burning piece of paper held under the baf e If your installation is correct smoke will go up the ue...

Страница 15: ...Floor into Attic CF Sentinal Intermediate Joist Shield Attic Insulation Shield Super Pro 2100 Attic Insulation Shield Attic Insulation Shield Super Vent 2100 Attic Insulation Shield Attic Insulation...

Страница 16: ...louver opening is blocked off and ex vent is connected to the vent holes in the top of the unit and run to discharge vent grilles Both 8 203mm diameter insulated Flex vents must be used along with one...

Страница 17: ...les used for fastening mesh penetrate studs at least 1 25mm 4 Mortar must be thin set or thin bed type inherentlypolymermodi ed Ifnotmodi ed you should add a synthetic latex additive Mix to a rm moist...

Страница 18: ...me Check dimen sionsfromopeningandmarkanddrillscrew holes Dependingontheinstallation heavier reinforcing wire screen may be required to bridge the stand off spacer area around the perimeter of the uni...

Страница 19: ...hers and screw top mesh C to top of grill frame This is attached with the top edge of the grill frame on piece B 10 Now fasten mesh to wall sheathing and blend in 11 Use only non combustible masonry p...

Страница 20: ...facing the right hand side of the rebox 2 Slide the air tube back towards the right side until it locks into place To lock into position use a pair of vise grips and tap them with a mallet until the t...

Страница 21: ...de the rebox and one on the underside of the rebox by removing the two nuts and bolts holding the 2 plates together from underneath the stove 4 Push the ash plug into the hole inside the rebox and rep...

Страница 22: ...nting Bracket located on the front of the fan transfer tray and secure with the 8 x 3 8 screw provided refer to Diagram 1 5 Install the wiring as shown on the wiring diagram Use the strength relief fo...

Страница 23: ...ARE ON THE SLOTTED HOLES ON RIGHT SIDE ONLY 43 000 1092mm 39 250 997mm ONCE THE TEMPLATE IS MOUNTED CHECK TO MAKE SURE THE SIDES ARE PLUMB AND 43 1092mm IN WIDTH NOTE THE TOP IS ANGLED BACK AT 5 DEGR...

Страница 24: ...D INSTALL THE SURROUND TEMPLATE ONTO THE UNIT WARNING KEEP MASONRY MATERIAL AT LEAST 1 2 13mm FROM THIS TOP FACING GUIDE THIS IS REQUIRED TO PREVENT MASONRY FACING MATERIAL FROM HITTING THE TOP STIFFE...

Страница 25: ...lled correctly according to the specification in the manual The nailing strips must be attached to the top and sides of the unit They must be positioned so that they are set back 13 mm from the face o...

Страница 26: ...p trim Center it and attach it to the top nailing strip with self drilling screws 8 It is recommended that the joints of the sheathing run horizontal from the top corners of the unit rather than verti...

Страница 27: ...w driver to let the screws for the handle through 2 Fasten the handles to the screen using the fasteners provided INSTALLING THE SCREEN ON THE FIREPLACE 1 Ensure doors are opened enough to allow fire...

Страница 28: ...ont of the fireplace and slide the louver down onto the screws Installing the Bottom Louver 3 Closethebottomlouverandsecureonthemagnetsprovided refer to Diagrams 1 and 2 1 Fasten the bottom louver fra...

Страница 29: ...he fireplace the facing guide must be installed 3 Attach the sides of the top louver opening adapter to the left and right facing guides with two 2 screws 8 x Optional 4 Install the optional masonry c...

Страница 30: ...move the handles by removing the nut and screw Install the new handles by placing them in position over the holes on the surround louver Put the screws through the holes and secure them by tightening...

Страница 31: ...e of local codes withthecurrentCanadianorNational Gas Codes CAN1 B149 or ANSI Z223 1 Installation Codes 2 The appliance when installed must be electrically grounded in accordance with local codes or i...

Страница 32: ...er Round Duct collar over hole and attach to the tabs using 3 screws B All Models 1 Determinethe locationoftheairregister fan housing assembly Cut a 5 x 16 121mm x 406mm hole between framing members w...

Страница 33: ...run Oval duct components are not supplied but can be purchased from an HVAC supplier OPERATION 1 Start the replace as per instructions and allow it to warm up 2 Turn the Wall Rheostat ON and adjust t...

Страница 34: ...ative pressure in the house allowing smoke to back into the home The preferred source of combustion air is from outside the building Ifpossible installthekitonthewind loading side of the building not...

Страница 35: ...y air tube and baf es b Removetheterminationcapbyremoving the screws and lifting c Make sure replace doors are shut to prevent soot and dirt from entering the loom d Clean chimney with either nylon or...

Страница 36: ...wer Complete Shelf Ash Drawer Ash Drawer Ash Drawer Lid 942 110 Ash Plug 820 375 Ash Hole Cover Plate Retainer Plate 9 948 326 Intake Pipe 6 948 327 Intake Pipe Insulation 948 416 6 Outside Air Kit Pa...

Страница 37: ...44 39 41 43 42 Brick Liner Bottom Left Vermiculite Liner Left Side Vermiculite Liner Right Side Brick Liner Back Left Brick Liner Back Right Vermiculite Liner Bottom Baffle Firebox Top Left and Right...

Страница 38: ...____________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _______________________________...

Страница 39: ...s of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitted to FPI b...

Страница 40: ..._______________________________________ Printed in Canada Regency replace products are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team carefully inspec...

Отзывы: