Greenfi re GF45 BioEnergy Stove
20
MAINTENANCE
Diagram 17
Diagram 18
TOP
RING
Maintenance Of The Burn-pot
Step 1:
Use a 9/16 wrench to unscrew the two nuts (Diagram 17). Then
to raise the ring, it may be necessary to insert a fl at screwdriver between
the outside of the burn-pot and the top ring (Diagram 18). If required,
use a rubber mallet to loosen.
Diagram 19
CYLINDER
BURN-POT
Step 4:
Use a rod which has a diameter of 1/8" (3 mm) to clean the
jets of the inner burn-pot (Diagram 20). Be sure to install the burn-pot
cylinder the correct way up. Angled holes to the top, straight holes to
the bottom.
Diagram 20
INNER
BURN-POT
Step 2:
Remove the cylinder from inside the burn-pot (Diagram 19).
Maintenance Of The
Ash-extraction System
Step 1:
Refer to Diagram 15 to determine the condition of the three
stainless steel ash screws. Sugars released by corn or wheat can stick
to the ash screws resulting in poor movement and ash removal. Check
by removing the ash-extraction system or look inside the burn pot.
Diagram 16
Diagram 15
Step 2:
Use a 9/16 wrench to unscrew the two nuts (Diagram 17). Then
to raise the ring, it may be necessary to insert a fl at screwdriver between
the outside of the burn-pot and the top ring (Diagram 18). If required, use
a rubber mallet to loosen.
Step 3:
Refer to Diagram 16. It is advisable to support the ash extraction
system before you undo these 9/16" nuts as once they are removed, the
ash extraction system will become loose and drop down. The "lovejoy"
connection will now be loose. This is an important part that must not be
misplaced or forgotten when re-assembling. Once removed soak screws
in warm water to remove deposits stuck to them from burning corn or
wheat, and use a copper based lithium grease on the auger gears.
Step 3:
If necessary, use a steel brush installed onto a drill to remove
minerals stuck to the interior wall of the cylinder.
MAINTENANCE
Содержание Dell-Point GF45
Страница 9: ...Green re GF45 BioEnergy Stove 9 INSTALLATION INSTALLATION HORIZONTAL TERMINATION Top View Side View...
Страница 10: ...Green re GF45 BioEnergy Stove 10 INSTALLATION OUTSIDE VERTICAL TERMINATION INSTALLATION Side View...
Страница 11: ...Green re GF45 BioEnergy Stove 11 INSTALLATION INSTALLATION VERTICAL TERMINATION Top View Side View Diagram 6...
Страница 12: ...Green re GF45 BioEnergy Stove 12 INSTALLATION EXISTING CLASS A CHIMNEY INSTALLATION Diagram 7...
Страница 13: ...Green re GF45 BioEnergy Stove 13 INSTALLATION INSTALLATION EXISTING MASONRY CHIMNEY Diagram 8...
Страница 28: ...Printed in Canada Copyright 2006 FPI Fireplace Products International Ltd All rights reserved...