background image

Greenfi re GF45 BioEnergy Stove

14

INST

ALLA

TION

INSTALLATION

OPTIONAL 12 VOLT

BATTERY INSTALLATION

This battery back-up will ensure uninterupted  operation of your stove 
in the event of unexpected loss of electrical power.  Note that this does 
not replace the regular 120 volt power supply to the stove. The battery is 
only a backup. The battery will generally last 6-9 hours on a full charge 
(depending on feed rate). See "Electrical Diagram" section  for details on 
hook-up. It is recommended to have your battery connected at all times. 
The battery will trickle charge whenever electrical power is restored and 
will continue to charge througout the process.

If there is no battery connected, a power interruption in excess of 5 
seconds, will cause the stove to immediately shutdown, once power is 
restored the stove will need to be restarted. A power interruption of less 
than 5 seconds will result in the stove picking up where it left off upon 
restoration of power.

To facilitate the installation of a larger 12 volt battery we include, exten-
sion alligator clip leads in the battery installation kit.  

 

Note: 12 volt batteries should never sit on stone or concrete. 

HOW TO INSTALL THE BATTERY:

1) Remove battery cage and battery from kit.
2) Attach red positive wire to battery.
3) Attach black negative wire to battery.
4) Place battery into cage facing up.
5) Slide battery cage with battery inside over four screws and tighten.
6) Attach red battery wire to red wire from unit.
7) Attach black battery wire to black wire from unit.

Children should be kept away from the hot stove. For all other questions 
contact your local dealer.

OPTIONAL GREENKEY 

INSTALLATION

The Greenkey is needed in order to burn Corn or Wheat, without it you 
can only burn wood pellets.

To install the Greenkey;

1)

 Open control panel cover.

2)

 Insert the GreenKey into keyhole.

3)

 Close control panel cover.

GreenKey

NOTE:

If the Greenkey is removed while burning corn or wheat you have 20 
seconds to put the greenkey back in place before the unit automatically 
goes into shut down mode.

Содержание Dell-Point GF45

Страница 1: ...uel burning room heater Failuretofollowtheseinstructionscouldresultin property damage bodily injury or even death Contact local building or re of cials about restrictions and installation inspection r...

Страница 2: ...about your product that are not covered in this manual please contact the FPI DEALER in your area Keep those FPI FIRES burning Safety Note If this stove is not properly installed a house re may result...

Страница 3: ...INSTRUCTIONS Control Panel Functions 15 Starting Procedures 16 To Start Your Stove 16 Priming Stove Empty Hopper 16 Burning Wood Pellets Primed Hopper 16 To Stop Stove 16 Operation Guidelines for Burn...

Страница 4: ...anieseach GF45 We have printed a copy of the contents here for your review The safety label is located on the back panel of the stove NOTE FPI units are constantly being improved Check the label on th...

Страница 5: ...rebox in a negative pressure situation These are safety functions of the appliance INSTALLATION UNIT LOCATION 1 For optimum bene t from your appliance speak to your professional for help with your lo...

Страница 6: ...e fans consume an average of 200 cfm which is more powerful than the combustionfanontheGF45 creatingnegativepressurearoundthestove To overcome this negative pressure the GF45 requires the installation...

Страница 7: ...LLATION INSTALLATION UNIT DIMENSIONS CLEARANCES Alcove Ceiling height is 60 324mm measured from bottom of the unit Floor Protector of 0 84k factor minimum is required beneath the Hearth Please check w...

Страница 8: ...or paved driveway which is located between two single family dwellings and serves both dwellings If the vent termination is accessible a certi ed guard shall be installed Local codes or regulations s...

Страница 9: ...Green re GF45 BioEnergy Stove 9 INSTALLATION INSTALLATION HORIZONTAL TERMINATION Top View Side View...

Страница 10: ...Green re GF45 BioEnergy Stove 10 INSTALLATION OUTSIDE VERTICAL TERMINATION INSTALLATION Side View...

Страница 11: ...Green re GF45 BioEnergy Stove 11 INSTALLATION INSTALLATION VERTICAL TERMINATION Top View Side View Diagram 6...

Страница 12: ...Green re GF45 BioEnergy Stove 12 INSTALLATION EXISTING CLASS A CHIMNEY INSTALLATION Diagram 7...

Страница 13: ...Green re GF45 BioEnergy Stove 13 INSTALLATION INSTALLATION EXISTING MASONRY CHIMNEY Diagram 8...

Страница 14: ...ere it left off upon restoration of power To facilitate the installation of a larger 12 volt battery we include exten sion alligator clip leads in the battery installation kit Note 12 volt batteries s...

Страница 15: ...elect the appropriate fuel type that is going to be burned Heat Level Settings Select the desired heat level by pressing buttons Heat levels range from 1 to 5 for all fuels Service Allows you to chang...

Страница 16: ...ht attempts To Start Your Stove To facilitate your start up and regardless of fuel being utilized in your stove you must use wood pellets as fuel for starting This will quickly raise the burner and ve...

Страница 17: ...u continue to use the same fuel i e Corn or Wheat Burn pot fuel bed If you cannot see 5 of the burn pot wall above your fuel ember bed the level is too high refer to Diagram 9b in Low Fuel Ember Bed C...

Страница 18: ...CLEAN THE COMBUSTION FAN FLYWHEEL X INSPECT THE SEALS X CLEAN THE CHIMNEY X INSPECT IGNITOR TUBES X COMPONENTS OF STOVE EACH START UP WEEKLY MONTHLY ANNUALLY REMOVE ASHES IN BURN POT X CHECK THE ASH R...

Страница 19: ...er avoid the use of a domestic style vacuum cleaner with lter only when the stove is cold to remove the ashes accumulated around the burn pot Diagram 10 Clean the interior of the glass door Use the sh...

Страница 20: ...corn or wheat can stick to the ash screws resulting in poor movement and ash removal Check by removing the ash extraction system or look inside the burn pot Diagram 16 Diagram 15 Step 2 Use a 9 16 wre...

Страница 21: ...iagram 26 Give the piece of paper a little tug and if it slips out easily the gaskets need to be replaced Use only approved gasket and adhesive obtainable from your FPI dealer A proper high temperatur...

Страница 22: ...ngs 5 levels of heat Electrical Min Capacity 25 amps 120 volts 120 volts or 240 volts AC 15 amps 240 volts Max Capacity 65 amps 120 volts 35 amps 240 volts 12 volts DC Min Capacity 1 8 amps 13 8 Volts...

Страница 23: ...the startup procedures as listed in the manual System Shutdown Contact Dealer a The feed auger fuse is blown Unit will go into shutdown mode After shutdown the screen will display Fuse Error EFF b The...

Страница 24: ...Pin 3 4 orange wires safety Pin 16 red wire Convection fan Pin 5 6 green wires safety Pin 17 black wire input Pin 7 black wire feed system Pin 18 white wire protection Pin 8 yellow wire feed system Pi...

Страница 25: ..._________ ___________________________________________________ ___________________________________________________ ___________________________________________________ __________________________________...

Страница 26: ..._______________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ____________________________...

Страница 27: ...er name purchase date model serial number problem parts requested Without this information the claim will be invalid Warranty is only valid if the maintenace schedule is followed as listed in the manu...

Страница 28: ...Printed in Canada Copyright 2006 FPI Fireplace Products International Ltd All rights reserved...

Отзывы: