Greenfi re GF45 BioEnergy Stove
17
OPERA
TION
OPERATING INSTRUCTIONS
Burning Corn or Wheat: Primed Hopper
NOTE: If the hopper is empty, follow steps 1 to 8 to Prime Stove.
1)
Open the control panel cover, if the GreenKey has not yet been inserted
gently push the key into the keyhole on the control panel.
2)
Select the fuel type by pressing the “Select Fuel” button until the appropri-
ate fuel type is displayed on the screen.
3)
Press the “Start” button and the screen will display
Manual Light.
4)
Open the front door and pour 2-1/2 cups of wood pellets into the burn
pot. Ensure that the pellets are levelled out & cover the ignitor hole.
5)
Close the front door.
6)
Press the “Start” button again and the screen will display
Ignition.
7)
The ignition sequence will take approximately 7 minutes to complete.
After 3-4 minutes you should start to see smoke coming from the burn
pot.
This is normal
, it means that the igniter is working. When the pellets
light and fl ames appear the smoke will disappear.
Selecting Proper Fuel Type
If you forget to select the proper fuel type. ie. set at wood but hopper is fi lled
with corn, the burn pot will fi ll with corn or wheat and will start smoking.
Immediately press the 'Stop' button and allow the unit to clean itself out.
The shutdown process will empty burn pot which takes 120 minutes.
NOTE:
Do not open the door at any time.
Clinker Prevention
Clinkers are a result of incomplete combustion in your burn-pot and, if by
chance they occur, can be controlled with correct use of your controls.
Incomplete and poor combustion in your appliance is related to the level
of the fuel bed height, the level of combustion air, the temperatures in
your burn-pot, and the rate of ash extraction from your burn-pot.
In the event that clinkers start to form , you can use the “poker” provided
to gently break this formation and allow the unit to then continue as before.
If you must open the fi rebox door while the unit is in operation, (to break
a clinker), always open gently and slowly.
Diagram 9a: Calibration Indicator / Pressure Gauge
(located below control panel at the side of the unit)
High Fuel / Ember Bed Control
If under the above display conditions, you have accumulated a high
fuel/ember bed, the following guidelines should help you eliminate the
problem and stabilize the fuel bed for future use. These should be one-
time changes and settings for as long as you continue to use the same
fuel. i.e. Corn or Wheat.
Burn-pot fuel bed
: If you cannot see 5” of the burn-pot wall above your
fuel/ember bed, the level is too high (refer to Diagram 9b in "Low Fuel/
Ember Bed Control" section).
1)
Hold the 'Service' button down for approximately 6 seconds.
Low Fuel/ember Bed Control
If under above display conditions, you have accumulated a low fuel/ember
bed the following guidelines should help you eliminate the problem and
stabilize the fuel bed for future use.
Burn-pot fuel bed:
If you see more than 5 ½” - 6” of the burn-pot wall
above your fuel/ember bed, the level is too low (refer to Diagram 9b).
After the initial start-up procedures and the unit has run undisturbed or
unaltered for at least one hour, visually check the combustion air fl ow and
ash removal indicator levels on the control panel by holding the 'Service'
button for approximately 6 seconds and check the settings for FAN and
ASH. They should read “10”.
If under these display conditions, you have a
low fuel/ember bed
, the fol-
lowing guidelines should help you eliminate the problem and stabilize the
fuel bed for future use. These should be one-time changes and settings for
as long as you continue to use the same fuel. i.e. Corn or Wheat.
1)
Hold the 'Service' button down for approximately 6 seconds.
2)
When FAN displays on the screen, gradually decrease the combustion
air to digital reading of “8” by pressing the "-" button. The default is
10, it ranges from 1 - 20.
3)
Press the 'Service' button once and ASH will display, gradually de-
crease the ash removal to digital reading of “8” by pressing the "-"
button. The default is 10, it ranges from 1 - 20.
4)
Press the 'Heat' button once to go back to main screen display.
This will reduce the rate of ash removal, allowing the fuel/ember bed to
build to the appropriate level. i.e. 5” from the top, or a 3” bed.
5"
Fuel/Ember Bed
Pellet
Feed
Tube
Ash Extraction
(Auger)
Diagram 9b
2)
When FAN displays on the screen, gradually increase the combustion
air to digital reading of “12” by pressing the "+" button. The default
is 10, it ranges from 1 - 20.
3)
Press the 'Service' button once and ASH will display, gradually in-
crease the ash removal to digital reading of “12” by pressing the "+"
button. The default is 10, it ranges from 1 - 20.
4)
Press the 'Heat' button once to go back to main screen display.
At this point you will notice an increase in the pressure reading on the
round Pressure Gauge (refer to Diagram 9a) indicator located below the
control panel. This will fl uctuate as you increase or decrease air fl ow. (This
is a good indicator to help you manage your settings.
Содержание Dell-Point GF45
Страница 9: ...Green re GF45 BioEnergy Stove 9 INSTALLATION INSTALLATION HORIZONTAL TERMINATION Top View Side View...
Страница 10: ...Green re GF45 BioEnergy Stove 10 INSTALLATION OUTSIDE VERTICAL TERMINATION INSTALLATION Side View...
Страница 11: ...Green re GF45 BioEnergy Stove 11 INSTALLATION INSTALLATION VERTICAL TERMINATION Top View Side View Diagram 6...
Страница 12: ...Green re GF45 BioEnergy Stove 12 INSTALLATION EXISTING CLASS A CHIMNEY INSTALLATION Diagram 7...
Страница 13: ...Green re GF45 BioEnergy Stove 13 INSTALLATION INSTALLATION EXISTING MASONRY CHIMNEY Diagram 8...
Страница 28: ...Printed in Canada Copyright 2006 FPI Fireplace Products International Ltd All rights reserved...