
Maintenance and care
115
Installing the absorption felt
• Install a new absorption felt as shown in
the illustration. The felt should be halfway
in the sealer.
• Bend the upper part of the felt to the right
and push it beneath the letter receiving tray
until it reaches the stop in the contour.
• Evenly push the arched absorption felt with
your hand into the water reservoir. Make
sure that the felt is correctly seated, in par-
ticular at the edges. The stop in the posi-
tioning contour must fit precisely in the
opening of the letter receiving tray.
• As a final measure, stroke with your finger
over the felt repeatedly to eliminate any
irregularities.
Positioning
contour
Absorption felt
Letter receiving tray
Содержание optimail 30
Страница 1: ...Franking machine Operator Manual optimail 30 ...
Страница 131: ...Appendix Menu overview 131 Menu overview ...
Страница 137: ...Appendix Declaration of Conformity 137 D e c l a r a t i o n o f C o n f o r m i t y ...
Страница 138: ...optimail 30 Operator Manual 138 ...
Страница 145: ...For your notes 145 ...
Страница 146: ...For your notes 146 ...
Страница 148: ...51 0034 3089 00 Rev 04 2011 03 xxx helbig berlin ...