8
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Step 5:
Check Mounted Posts
1. Shim post as needed to ensure post is level.
Fig. 1
Fig. 2
Shim post as needed to
ensure post is level
Deck Board
Rim
Jois
t
Joist / Blocking
Wood Block
1/2”
[12.5
mm
]
Step 1:
Mark Bracket Hole Locations
1. Mark the centerline of each post with a pencil.
2. Take measurements used in Fig. 1 and 2 to mark bottom
and top bracket hole locations onto posts.
BRACKET INSTALLATION
Fig. 1
Bracket Hole Locations
Pre-drill Dimensions: Pre-drilling with a 3/16”[4.5mm] drill bit is required
3
-
13/16” [97mm]
A*
3/8” [9.5mm]
B
3/8” [9.5mm]
35-1/16” [890.5mm]
C
41-3/16” [ 1047mm]
3/4” [19mm]
D
*Dimension A positions bottom edge of rail (1)
3-1/2” [89mm] and (2)
2” [51mm]
above deck surface.
*Dimension A is measured from the bottom surface of post base.
2-1/2” [63.5mm]
3/4” [19mm]
32-1/2” [826mm] Panel
40” [1016mm] Panel
(1)
(2)