132
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Fig. 2
FERRURE À ANGLE : INSTALLATION DE COUVRE-FERRURE, CAPU-
CHON ET CACHE-BASE DE POTEAU
•
Consulter les instructions d’installation des couvre ferrures,
cache-bases et capuchons de poteau aux pages 23 et 24.
Fig. 3
Fig. 4
OTP
and Proud Post: Max Post Spacing
• 8’
panel maximum post spacing is 93-7/8”.
• 6’
panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’
Panel max post spacing 93-7/8”
6’
Panel max post spacing 69-7/8”
OTP
and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of
the bracket on other post.
• Confirm that the measurements for the top brackets are the
same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
OTP
and Proud Post: Max Post Spacing
• 8’
panel maximum post spacing is 93-7/8”.
• 6’
panel maximum post spacing is 69-7/8”.
Note: Do not exceed the maximum post spacing.
8’
Panel max post spacing 93-7/8”
6’
Panel max post spacing 69-7/8”
OTP
and Proud Post: Measuring The Panel Opening Length
• Measure the distance of the panel opening.
• Measure from the back wall of the bracket to the back wall of
the bracket on other post.
• Confirm that the measurements for the top brackets are the
same as the bottom brackets.
Measure the panel opening
Not here
Measure from
back of bracket
Check measurement with top
3/12
Fig. 1
La RDS doit dépasser sur le poteau de 1 po
(25,5 mm) de chaque côté.