44
PURE VIEW: Al
13
HOME GLASS BALUSTER INSTALLATION
Fig. 1
Step 2:
Cutting the Round ATR to length
1. Measure the distance from the inside edge of the 2 posts.
2. Use an Adjustable Angle Finder
to measure the angle need
-
ed to make the ATR flush with the post. As shown in Fig. 2.
3. Use angle found with
Angel Finder to mark the cut lines on
the ATR, and cut the ATR to length, file the edges, and paint
using the same steps as used for cutting down a panel.
4. When test fitting the ATR, place it on top of the spacers.
Do not press the ATR down over the spacers. Removing the
ATR from the spacers can damage the ATR and spacers.
5. Make sure the inside of the ATR is clean before remove the
backing of all of the double-sided tape on the ATR spacers.
6. A Rubber Mallet might be needed to complete installation.
If using a Rubber Mallet, use a cloth to protect the ATR
from damage. The ATR snaps down around the ATR spacer.
7. If you are installing a OTP Line Post, see the next page
before permanently installing the ATR.
Double Sided
Tape
Fig. 2
Spacer Mounted Next
To Stair Bracket
14”
Ma
x
• The spacers should be equally spaced along the length
of the rail, with no more then 14” [355.5mm]spacing
between them.
• The end spacers should be placed as close to the end
brackets as possible.