Installation and operation instructions
Installation and operation instructions
HOBS
13
If gas pressure parameters differ from values
recommended (or pressure is subject to fluc-
tuations), there must be a pressure regulating
device to be installed at the intake pipeline.
Connect the appliance to a local gas supply
system, using a rigid metal pipe and pipe
connections, or a flexible pipe made of stain-
less steel (pipes of both types shall conform
to valid standards). Make sure that flexible
metal pipes do not come into contact with
movable parts. They also must be neither da-
maged nor squeezed.
The outer thread size of the connecting gas
pipe line is ½’’. Avoid any force impact upon
the gas hob when connecting it.
Attention!
Upon completion of installation, it is a
must to check leak tightness of connec-
tions, using soap solution!
DO NOT CHECK LEAK TIGHTNESS OF
CONNECTIONS USING A FLAME!
CONNECTION TO THE MAINS
The present appliance is designed for 220–
240 V, 50 / 60 Hz. It must be connected to
the mains subject to valid norms, regulations
and laws.
The plug and power cable shall conform to
relevant standards and power consumed by
the appliance.
The yellow-green earth wire shall not be in-
terrupted by a breaker switch.
The power cable shall anyway be laid in such
a way so that the temperature at any point of
it does not exceed the ambient one by more
than 50°C.
Attention! Do not use extension cables
to connect to the mains. They can over-
heat and inflame!
Grounding is an obligatory condition!
The manufacturer shall in no circum-
stances be liable for ignoring the inst-
ructions by a user.
If the power cable turns out to be dama-
ged, it is a qualified professional of the
service center who has to replace it.
Is the power cable subject to replacement,
use only those cables providing for the pro-
per operation of the appliance at existing
loads and operating temperatures. The earth
wire (yellow-green) shall be 20 cm longer
than any other one. For this equipment cab-
les are used, the cross-section area of which
makes 3 x 0.75 mm.
Содержание PGA 45 FIERO BL
Страница 22: ...Installation and operation instructions HOBS 20...
Страница 23: ......
Страница 24: ...www fornelli tech com...