- 2 -
INDEX
1. GENERAL INFORMATION
3
1.
Distillation unit S for non flammable solvents
3
2.
Distillation unit D for flammable solvents
3
3.
Operating principle
3
4.
Operation
3
5.
Safety features
3
2. TECHNICAL INFORMATION
4
3. INSTALLATION PLACE
5
3.1. Installation place
5
4. ASSEMBLY AND INSTALLATION
7
4.1. Frame mounting
7
4.2. Floor fixing
7
4.3. Earth connection of the machine and the auxiliary vesselsFel! Bokmärket är inte definierat.
4.4. Bleeding valve
7
4.5. Verification of the cover gasket
8
4.6. Connecting the distillate tank
8
4.7. Electrical connection
Fel! Bokmärket är inte definierat.
5. STARTING OPERATIONS
9
5.1. Positioning of the Rec- Bag
9
5.2. Solvent loading
9
5.3. Cover closing
10
5.4. Programming of the working cycle
10
5.5. Stop of the unit
12
5.6. Residue unloading
12
5.7. Important advices
13
6. SAFETY SYSTEMS AND ALARMS
14
6.1. Temperature safeties
14
6.2. Over pressure safety
14
7. DEFECTS AND SOLUTIONS
15
8. MAINTENANCE
17
8.1. Daily maintenance
17
8.2. Weekly maintenance
17
8.3. Maintenance every 2000 working hours
17
9. VACUUM GENERATOR (OPTIONAL)
20
9.1. General description
20
9.2. Technical details vacuum group
20
9.3. Connections
20
9.4. Testing
20
9.5. Vacuum switch
21
10. SPARE PARTS
22
10.1. Si7 / Si12
Fel! Bokmärket är inte definierat.
10.2. Di12
Fel! Bokmärket är inte definierat.
10.3. Si25 / Di25
Fel! Bokmärket är inte definierat.
11. DISASSEMBLY AND DEMOLITION
24
11.1. Disassembly
24
11.2. Demolition
24
12. WIRING DIAGRAMS
25
ANNEXES
CE (DECLARATION OF CONFORMITY)
WARRANTY CERTIFICATE
Содержание Drester 120
Страница 1: ...INSTR 11213 1 REV 14 04 08 Bom GODK DRESTER 120 USE and MAINTENANCE ENGLISH...
Страница 23: ...22 10 SPARE PARTS...
Страница 26: ...25 12 WIRING DIAGRAMS...
Страница 27: ...26 NOTES Page intentionally left blank...