- 10 -
5.4.
Solvent loading
Pour the solvent to be distilled into the boiler up to the reference sign which indicate the maximum
level. Make sure not to pour solvent into the vapour manifold: the first distillate would come out dirty.
The machine is equipped with a lateral loading pipe for easy connection to the washing booth.
5.5.
Cover closing
1.
Hook the cover closing handle over the cover bar. When closing the cover, pay attention not to damage
the cover seal.
2.
Rotate the cover closing handle to complete the cover closure.
1
2
5.6.
Programming of the working cycle
a.
Command panel RS 120
1
Red light: Alarm
2
Working thermostat
3
Green light: Power ON
4
Cycle timer
5
Green light: Heating ON
Содержание Drester 120
Страница 1: ...INSTR 11213 1 REV 14 04 08 Bom GODK DRESTER 120 USE and MAINTENANCE ENGLISH...
Страница 23: ...22 10 SPARE PARTS...
Страница 26: ...25 12 WIRING DIAGRAMS...
Страница 27: ...26 NOTES Page intentionally left blank...