FlowLine LI1 Series Скачать руководство пользователя страница 11

Model LI1X Universal Process Meter

Instruction Manual

Model LI1X Universal Process Meter

Instruction Manual

Select Input Signal

The meter can be programmed to accept current or voltage input
using the Signal Input Selection Array. This jumper array is located at
the rear of the instrument, next to the screw terminal block. Remove
jumper J3 (if installed) to disable Lockout feature.

Table 1: Signal Input Selection Array

Initial Calibration with External Source (If Needed)

Initial calibration is required only when the 

I-

C

AL

feature is to be used

with an input other than the default input of 4-20 mA. For best results,
allow the meter to warm up for at least 30 minutes.

1. Program the Signal Input Selection Array for desired input per 

Table 1 above.

2. Apply power with 

ENTER

and 

ACK

buttons pushed. Release when

display stops flashing.

3. The meter scrolls through the choices 

20, 5,

and 

10.

Which 

corresponds to input signals of 4-20 mA, 0-5 V or 1-5 V, and 0-10 V. 
Push 

ENTER

when desired value appears.

4. The meter flashes 

InPt 1

. Apply low end signal, (4 mA or 0 V)*, 

push 

ENTER

.

5. The meter flashes 

InPt 2

. Apply high end signal, (20 mA, 5 V, 

10 V),  push 

ENTER

.

6. This completes the Initial Calibration and initializes INPUT 1 and 

INPUT 2 scaling points to 4.000 & 20.000 mA, 0.000 & 5.000 V, or 
0.000 & 10.000 V.

7. Refer 

to 

I-

C

AL

scaling below for further instructions.

*For 1-5 V input signals, calibrate the meter with input1=0 V, 
input 2=5 V.

20

Input Signal

Jumper J1

Jumper J2

1-5, 0-5V

OFF

OFF 

0-10 V

OFF

ON

4-20,0-20 mA

ON

OFF

21

Select Calibration Method

The meter may be calibrated using an external signal source such as a
calibrator  (

E-

C

AL

), or scaled using the internal source (

I

I-

C

AL

). With 

I-

C

AL

, a 4-20 mA input can be scaled for any display range without

applying a signal. To scale inputs such as 0-5 V, 1-5 V or 0-10 V without
applying a signal, it is necessary to first complete an Initial Calibration,
see Initial Calibration with External Source (If Needed) on page 20.

Scale or Calibrate the Meter

To select a Calibration Method, apply power with 

ACK

button pressed.

1. When display stops flashing, release 

ACK

button. Display 

alternates between 

E-

C

AL 

and

I-

C

AL

.

2.  To calibrate meter with an external source, such as a calibrator, 

press 

ENTER

when 

E-

C

AL

appears.

3. To scale meter with internal source, press 

ENTER

when 

I-

C

AL

appears.

Select Decimal Point (

dE

C

Pt

)

To program the decimal point or light up the extra "0", push 

ENTER

.

The meter displays 

S

C

ALe 

or 

C

alib

, then 

dE

C

Pt

. Push 

ENTER

when

dE

C

Pt

appears. The meter then reads 199990 with the decimal point

changing locations and the extra "0" illuminating. Push 

ENTER

when

the decimal point is in the desired position; or if the extra "0" is
desired; when the extra "0" is displayed.

Select Linear Input (

L or S

)

The meter can be programmed to either process the input signal in a
linear fashion (

L

) or to take the square root of it (

S

). To program the

meter for a linear input, push 

ENTER

. When  (

L or S

) appears, push

ENTER

again. The meter will flash (

L or S

) alternately. Press 

ENTER

when (

L

) is flashing. After (

L

) is selected the meter will switch to indi-

cation mode and is ready to be calibrated.

Select Number of Calibration Points (

no. PtS

)

The user may input up to 11 calibration points and corresponding 
displays to provide custom linearization. To program the number of
calibration points, push 

ENTER

, when (

no. PtS

) appears, push 

ENTER

again. The meter displays a number from 2 to 11 that represents the
number of calibration points. Push 

ENTER

when the number equals

the desired number of calibration points. As soon as the number of
points is programmed, the meter flashes 

InPt 1

(Indicating it is ready

to be calibrated). Refer to Scale Using Internal Calibration (

I-

C

al

),

page 22 or Calibrate Using an External Calibrator 
(

e-

C

al

) on page 23.

Spec Tech Industrial Electric

               www.spectechind.com

888-773-2832

Spec Tech Industrial Electric

               www.spectechind.com

888-773-2832

Содержание LI1 Series

Страница 1: ...Display to 199 990 11 Point Linearization Square Root Extraction with Low flow Cutoff 41 2 Digit Extra Zero Type NEMA 4X Front Panel 2 or 4 Relays 4 20 mA Output Options Lockout Feature Non volatile M...

Страница 2: ...nt dECPt 21 Select Linear Input L or S 21 Select Number Of Calibration Points no PtS 21 General Calibration Scaling Instructions 22 Scale Using Internal Calibration I Cal 22 Calibrate Using an Externa...

Страница 3: ...rs valves etc It is recommended to use this meter in a fail safe system that accommodates the possibility of meter failure or power failure WARNING Hazardous voltages exist within enclosure Installati...

Страница 4: ...Cutoff point will CUTOFF result in a display of zero May be set from 1 count to 100 of full scale user selectable 6 11 POINT Input Range Minimum Span LINEARIZATION Between Inputs 4 20 mA 1 6 mA Number...

Страница 5: ...POWER SUPPLY OUTPUT LOOP Power supply Min loop Max loop RESISTANCE resistance resistance 24 VDC 10 ohms 600 ohms 35 VDC external 600 ohms 1000 ohms 8 Model LI1X Universal Process Meter Instruction Ma...

Страница 6: ...on Manual 11 10 SETUP AND PROGRAMMING Power Signal External Functions Options Connections Disconnect power to the meter before making any connections Do not connect power or earth ground to any unused...

Страница 7: ...AC 4 20 mA Transmitter 3 2 1 Signal Input Selection Array Lockout Jumper L L P P S S C H A O L C M D K Signal Input Selection Array Loop Power Supply 4 20 mA Transmitter AC 3 2 1 Lockout Jumper L L P...

Страница 8: ...Powered Meters Power Signal External Functions Figure 6 Transmitter and Meter Powered from Same DC Power Supply Figure 7 Transmitter and Meter Powered from Separate DC Power Supplies 14 15 24 VDC Powe...

Страница 9: ...tely programmed using just the ENTER button The general method behind SBS is to push ENTER when the meter reads the desired value This value may be a menu title the entire display or just a single dig...

Страница 10: ...ore it starts to scroll to accept it 4 If a flashing digit is not OK or if ENTER was not pushed in time to accept it wait for the digit to scroll and push ENTER when OK 5 Digits will scroll until ENTE...

Страница 11: ...is necessary to first complete an Initial Calibration see Initial Calibration with External Source If Needed on page 20 Scale or Calibrate the Meter To select a Calibration Method apply power with AC...

Страница 12: ...uction Manual 22 23 General Calibration Scaling Instructions Calibration is performed from the front panel using the ENTER but ton It does not require any tools or disassembly of the meter A calibrate...

Страница 13: ...ero flow rate usually zero the high flow rate and the Low flow Cutoff point To program the meter for square root extraction push ENTER When L or S appears push ENTER again The meter will flash L or S...

Страница 14: ...put option can be programmed without a calibrator This option can be calibrated so that a 4 mA out put is produced for any number displayed by the meter The 20 mA output may be programmed to correspon...

Страница 15: ...ct on the alarm status LEDs Automatic Manual Reset Programming There are two ways to reset the relays 1 Automatically when the signal passes through the reset point 2 Automatically manually via the fr...

Страница 16: ...ng inductive loads However installing Resistor Capacitor RC Networks improves this performance and prolongs the life of the meter s relay contacts This suppression can be obtained with RC networks ass...

Страница 17: ...ur screws and washers 11 Reassemble front covers and install connectors Figure 18 Removing Front Bezel Model LI1X Universal Process Meter Instruction Manual Figure 19 Internal View of Meter Option Car...

Страница 18: ...ut 7 set point display 7 Input 8 set point display 8 Input 9 set point display 9 Input 10 set point display 10 Input 11 set point display 11 Alarms Alarm 1 set point reset point Alarm 2 set point rese...

Страница 19: ...truction Manual LIM690FL Rev B 6 99 10500 Humbolt Street Los Alamitos CA 90720 Tel 562 598 3015 Fax 562 431 8507 Spec Tech Industrial Electric www spectechind com 888 773 2832 Spec Tech Industrial Ele...

Отзывы: