Page 58 of 64
versatile™ 4C Maintenance Manual—206367—Rev A
www.florencemailboxes.com
Replacement of Center or Bottom Shelf
versatile™ 4C mailbox suites
REQUIRED TOOLS
1/8” DRILL BIT
PLASTIC MALLET
PNEUMATIC BLIND RIVET GUN
PORTABLE DRILL
TOOLS FROM EARLIER STEPS
1 .
Open the master door(s) using procedures
on pp. 8–13.
2 .
If the shelf being replaced is not riveted
in place, proceed to Step 3. If the shelf is
riveted in place:
A.
Remove the 4C mailbox module from the
wall or enclosure using procedures on
pp. 14–15.
B.
Using a 1/8” drill bit, drill out 1/8”
dia x 0.337” SS blind rivets (
86098
)
holding the shelf in place.
3 .
Using a plastic mallet, apply force
underneath the shelf to be removed,
dislodging it from the metal snaps holding it
to the insert panel.
PART #
DESCRIPTION
86051M
CENTER OR BOTTOM SHELF
86098
1/8” DIA X 0.337” SS BLIND RIVET
NOTE: Some front-loading module shelves are riveted in place for strength
and/or security. Up to five (5) 1/8” dia x 0.337” SS blind rivets
(86098) per shelf must be removed from below the shelf before
replacing the shelf. This will require removing the module from the wall
(see pp. 14–15).
NOTE: This procedure will require opening the master door(s). Contact local
postal officials to gain access to units serviced by the USPS.
4 .
To replace the shelf, place it above the metal
snaps, align it front to back, and apply force
with a plastic mallet to snap the shelf back
into place.
5 .
If the original shelf was riveted in place:
A.
Resecure the shelf with 1/8” dia x
0.337” SS blind rivets (
86098
) and
reattach the insert panel to the slide
housing for dbl column modules.
6 .
Reinstall the module in the wall or enclosure
using procedures on pp. 14–15.
7 .
Close the master door(s) and lock the
master-access door using procedures on
pp. 8–13.
Confidential & Proprietary for Florence and Clients Only -- Do Not Distribute