Page 28 of 64
versatile™ 4C Maintenance Manual—206367—Rev A
www.florencemailboxes.com
Replacement of Master-Door Latch-Slide Mechanism
versatile™ 4C mailbox suites
REQUIRED TOOLS
1/8” DRILL BIT
PNEUMATIC BLIND RIVET GUN
PORTABLE DRILL
TOOLS FROM EARLIER STEPS
1 .
Open the master door(s) using procedures
on pp. 8–13.
2 .
Remove the 4C mailbox module from the
wall or enclosure using procedures on
pp. 14–15.
3 .
Remove the top trim piece using procedures
on pp. 18–19.
4 .
For tenant or tenant-with-parcel modules:
A.
Drill out 1/8” dia x 0.337” SS blind
rivets (
86098
) from all wear plates
(
64245
—sgl column;
91037
—dbl
column).
B.
Remove the master-door latch-release
handle using procedures on
pp. 22–23.
5 .
Slide the master-door slide assembly up
through the top of the slide housing, and
replace it.
PART #
DESCRIPTION
64245
WEAR PLATE (SGL COLUMN)
86098
1/8” DIA X 0.337” SS BLIND RIVET
91037
WEAR PLATE (DBL COLUMN)
VARIES
FRONT MLD SLIDE KIT (Contact authorized Florence dealer or customer service
representaive)
NOTE: This procedure will require opening the master door(s). Contact local
postal officials to gain access to units serviced by the USPS.
6 .
For tenant or tenant-with-parcel modules:
A.
Reinstall the master-door latch-release
handle using procedures on
pp. 22–23.
B.
Reinstall all wear plates (
64245
—sgl
column;
91037
—dbl column) using
1/8” dia x 0.337” SS blind rivets
(
86098
).
7 .
Reinstall the top trim piece using procedures
on pp. 18–19.
8 .
Reinstall the module in the wall or enclosure
using procedures on pp. 14–15.
9 .
Close the master door(s) and lock the
master-access door using procedures on
pp. 8–13.
Confidential & Proprietary for Florence and Clients Only -- Do Not Distribute