Flin Energy 3kVA-24V Скачать руководство пользователя страница 13

FlinSlim Edge Solar Hybrid Inverter with In-Built Stabilizer

 

FLIN ENERGY

 

11 

 

OPERATION  
 

Power ON/OFF  

 

 

Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch 

to turn on the unit.  

 

 

 Operation and Display Panel  

The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes 

three indicators, four function keys and a LCD display, indicating the operating status and input/output 
power information.  

LED 

indicators  

  

Function 

keys  

LCD display  

 

 

LED Indicators 

 

LED Indicator 

   

Messages 

 

  

Green  

Solid On   Output is powered by utility in Line mode.  

Flashing   Output is powered by battery or PV in battery mode.  

  

Green  

Solid On   Battery is fully charged.  

Flashing   Battery is charging.  

  

Red  

Solid On   Fault occurs in the inverter.  

Flashing   Warning condition occurs in the inverter.  

  

Function Keys 

 

Function Key 

 

Description 

 

ESC  

To exit setting mode  

SELECT  

To go to next page or next selection  

ENTER  

To confirm the selection in setting mode or enter setting mode  

Содержание 3kVA-24V

Страница 1: ...User Manual FlinSlim Edge Solar Hybrid Inverter With Inbuilt Stabilizer Version 1 1 ...

Страница 2: ...nspection 3 Installation 4 Battery Connection 5 AC Input Output Connection 7 PV Connection 8 Communication Connection 10 OPERATION 11 Power ON OFF 11 Operation and Display Panel 11 LCD Display Icons 12 LCD Setting 13 Display Setting 19 Operating Mode Description 21 Fault Reference Code 22 Warning Indicator 23 SPECIFICATIONS 23 TROUBLE SHOOTING 27 Appendix I Parallel function Only for 5K model 28 A...

Страница 3: ...EVER charge a frozen battery 7 For optimum operation of this inverter charger please follow required spec to select appropriate cable size It s very important to correctly operate this inverter charger 8 Be very cautious when working with metal tools on or around batteries A potential risk exists to drop a tool to spark or short circuit batteries or other electrical parts and could cause an explos...

Страница 4: ...ty via LCD setting Compatible to mains voltage or generator power Auto restart while AC is recovering Overload Over temperature short circuit protection Smart battery charger design for optimized battery performance Cold start function Basic System Architecture The following illustration shows basic application for this inverter charger It also includes following devices to have a complete running...

Страница 5: ...ts 3 AC output terminal 4 AC input 5 Communication port 6 PV input 7 Battery input 8 Circuit breaker 9 Parallel connectors only available for parallel models INSTALLATION Unpacking and Inspection Before installation please inspect the unit Be sure that nothing inside the package is damaged You should have received the following items inside of package ...

Страница 6: ...a clearance of approx 20 cm to the side and approx 50 cm above and below the unit SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON COMBUSTIBLE SURFACE ONLY Please follow the steps as below to finish the installation Employ the mounting plate as a template for marking the positions of the boreholes Mount the mounting plate with supplied screws to fix the plate in place Insert two screws to the two si...

Страница 7: ...r in a protected area that is free of excessive dust and has adequate air flow Please place the inverter away from other units at least 20 cm to avoid interference Battery Connection CAUTION For safety operation and regulation compliance it s requested to install a separate DC over current protector or disconnect device between battery and inverter It may not be requested to have a disconnect devi...

Страница 8: ... 3 Nm 2 8AWG 14 6 4 29 2 Please follow below steps to implement battery connection 1 Assemble battery ring terminal based on recommended battery cable and terminal size 2 3KVA model supports 24VDC system and 5KVA model supports 48VDC system Connect all battery packs as below chart It s suggested to connect at least 100Ah capacity battery for 3KVA model and at least 200Ah capacity battery for 5KVA ...

Страница 9: ...TION There are two terminal blocks with IN and OUT markings Please do NOT mis connect input and output connectors WARNING When using sockets as the output please make sure that the current of each socket is less than 10A in case of electric hazard WARNING All wiring must be performed by qualified person WARNING It s very important for system safety and efficient operation to use appropriate cable ...

Страница 10: ...ircuits If a power shortage occurs and recovers in a short time it will cause damage to your connected appliances To prevent this kind of damage please check manufacturer of air conditioner if it s equipped with time delay function before installation Otherwise this inverter charger will trig overload fault and cut off output to protect your appliance but sometimes it still causes internal damage ...

Страница 11: ...fter considering Voc of PV module not exceed 105Vdc and max Vmpp of PV module close to 60Vdc or within 56Vdc 72Vdc we can choose PV module with below specification Maximum Power Pmax 260W Max PV module numbers in series 2 30 9 x 2 56 72 Max Power Voltage Vmpp V 30 9V Max Power Current Impp A 8 42A PV module numbers in parallel 6 50 A 8 42 Total PV module numbers 2 x 6 12 Open Circuit Voltage Voc V...

Страница 12: ...nication cable to connect to inverter and PC This communication port is also can be replaced with SNMP card When installing with SNMP card in the inverter it will provide advanced communication and monitoring options After communication cable is connected well insert bundled CD into a computer and follow on screen instruction to install the monitoring software For the detailed software operation p...

Страница 13: ...splay indicating the operating status and input output power information LED indicators Function keys LCD display LED Indicators LED Indicator Messages Green Solid On Output is powered by utility in Line mode Flashing Output is powered by battery or PV in battery mode Green Solid On Battery is fully charged Flashing Battery is charging Red Solid On Fault occurs in the inverter Flashing Warning con...

Страница 14: ...e and charging status Indicates battery voltage is low In line mode it will present battery capacity as below table when unit is charging Status Battery voltage LCD Display Constant Current mode Constant Voltage mode 2V cell 4 bars will flash in turns 2 2 083V cell 25 bar will be on and the other three bars will flash in turns 2 083 2 167V cell Two bars will be on and the other two bars will flash...

Страница 15: ...0 50 75 75 100 Mode Operation Information Indicates the load is supplied by utility power Indicates the load is supplied by battery or solar Indicates alarm or fault is happened Indicates the solar charger circuit is working Indicates the utility charger circuit is working LCD Setting After pressing and holding ENTER button for 3 seconds the unit will enter setting mode Press SCROLL button to sele...

Страница 16: ... priority Solar and battery energy will provide power to the loads only when utility power is not available SBU priority Solar energy provides power to the loads as first priority If solar energy is not sufficient to power all connected loads battery energy will supply power to the loads at the same time Utility provides power to the loads only when battery voltage drops to either low level warnin...

Страница 17: ...mode and line mode 04 Power saving mode enable disable Saving mode disable default If disabled no matter connected load is low or high the on off status of inverter output will not be effected Saving mode enable If enabled the output of inverter will be off when connected load is pretty low or not detected 05 Battery type AGM default Flooded User Defined If User Defined is selected battery charge ...

Страница 18: ...A 12 Setting voltage point back to utility source when selecting SBU priority or Solar first in program 01 Available options in 24V models 22 0V 22 5V 23 0V default 23 5V 24 0V 24 5V 25 0V 25 5V Available options in 48V models 44V 45V 46V default 47V 48V 49V 50V 51V 13 Setting voltage point back to battery mode when selecting SBU priority or Solar first in program 01 Available options in 24V model...

Страница 19: ...programmed as below Solar first Solar energy will charge battery as first priority Utility will charge battery only when solar energy is not available Utility first Utility will charge battery as first priority Solar energy will charge battery only when utility power is not available Solar and Utility Solar energy and utility will charge battery at the same time Only Solar Solar energy will be the...

Страница 20: ...unit will transfer to line mode if overload occurs in battery mode Bypass disable default Bypass enable 25 Record Fault code Record enable Record disable default 26 Bulk charging voltage C V voltage 24V model default setting 28 2V 48V model default setting 56 4V If self defined is selected in program 5 this program can be set up Setting range is from 24 0V to 29 2V for 24V model and 48 0V to 58 4V...

Страница 21: ... Max input solar power Max battery charging power Connected load power Solar power balance disable If selected the solar input power will be the same to max battery charging power no matter how much loads are connected The max battery charging power will be based on the setting current in program 02 Max solar power Max battery charging power Display Setting The LCD display information will be swit...

Страница 22: ...voltage 60V Total charging power Total charging power 1600W Solar charging power Solar charging power 1000W Battery voltage Output frequency Battery voltage 28 0V output frequency 50 0Hz Main CPU version checking Main CPU version 1 00 Secondary CPU version checking Secondary CPU version 1 00 ...

Страница 23: ...Power saving mode If enabled the output of inverter will be off when connected load is pretty low or not detected No output is supplied by the unit but it still can charge batteries Charging by utility Charging by PV energy No charging Fault mode Note Fault mode Errors are caused by inside circuit error or external reasons such as over temperature output short circuited and so on PV energy and uti...

Страница 24: ... the mains It will also charge the battery at line mode Charging by PV energy Charging by utility Battery Mode The unit will provide output power from battery and PV power Power from battery and PV energy Power from battery only Fault Reference Code Fault Code Fault Event Icon on 01 Fan is locked when inverter is off 02 Over temperature ...

Страница 25: ...output 56 Battery connection is open 57 Current sensor failed 58 Output voltage is too low NOTE Fault codes 51 52 53 55 56 57 and 58 are only available in 5K model Warning Indicator Warning Event Audible Alarm Icon flashing Fan is locked when inverter is on Beep three times every second Battery is over charged Beep once every second Low battery Beep once every second Overload Beep once every 0 5 s...

Страница 26: ...Loss Frequency 65 1Hz High Loss Return Frequency 63 1Hz Output Short Circuit Protection Line mode Circuit Breaker Battery mode Electronic Circuits Efficiency Line Mode 95 Rated R load battery full charged Transfer Time 10ms typical For UPS 20ms typical For Appliances Output power derating When AC input voltage drops to 170V depending on models the output power will be derated Output Power 90V 170V...

Страница 27: ...8Vdc Cold Start Voltage 23 0Vdc 46 0Vdc Low DC Warning Voltage load 20 22 0Vdc 44 0Vdc 20 load 50 21 4Vdc 42 8Vdc load 50 20 2Vdc 40 4Vdc Low DC Warning Return Voltage load 20 23 0Vdc 46 0Vdc 20 load 50 22 4Vdc 44 8Vdc load 50 21 2Vdc 42 4Vdc Low DC Cut off Voltage load 20 21 0Vdc 42 0Vdc 20 load 50 20 4Vdc 40 8Vdc load 50 19 2Vdc 38 4Vdc High DC Recovery Voltage 29Vdc 58Vdc High DC Cut off Voltag...

Страница 28: ...bilizer FLIN ENERGY 26 Table 3 Charge Mode Specifications Table 4 General Specifications INVERTER MODEL 3KVA W O MPPT 3KVA With MPPT 5KVA W O MPPT 5KVA With MPPT Safety Certification CE Operating Temperature Range 0 C to 55 C Storage temperature 15 C 60 C ...

Страница 29: ...well or if input voltage range setting is correct UPS Appliance Green LED is flashing Set Solar First as the priority of output source Change output source priority to Utility first When the unit is turned on internal relay is switched on and off repeatedly LCD display and LEDs are flashing Battery is disconnected Check if battery wires are connected well Buzzer beeps continuously and red LED is o...

Страница 30: ...e supported maximum output power is 24KW 30KVA 2 Maximum six units work together to support three phase equipment Four units support one phase maximum The supported maximum output power is 24KW 30KVA and one phase can be up to 16KW 20KVA NOTE If this unit is bundled with share current cable and parallel cable this inverter is default supported parallel operation You may skip section 2 If not pleas...

Страница 31: ...proper air circulation to dissipate heat allow a clearance of approx 20 cm to the side and approx 50 cm above and below the unit Be sure to install each unit in the same level 5 Wiring Connection The cable size of each inverter is shown as below Recommended battery cable and terminal size for each inverter Ring terminal Model Wire Size Ring Terminal Torque value Cable mm2 Dimensions D mm L mm 5KVA...

Страница 32: ...ely disconnected during maintenance and fully protected from over current of battery or AC input The recommended mounted location of the breakers is shown in the figures in sections 5 1 and 5 2 Recommended battery breaker specification for each inverter Model One unit 5KVA 100A 60VDC If you want to use only one breaker at the battery side for the whole system the rating of the breaker should be X ...

Страница 33: ...ll inverters will share the same battery bank Otherwise the inverters will transfer to fault mode 5 1 Parallel Operation in Single phase Two inverters in parallel Power Connection Communication Connection Three inverters in parallel Power Connection Communication Connection N L N L Load N L N L Load ...

Страница 34: ...FlinSlim Edge Solar Hybrid Inverter with In Built Stabilizer FLIN ENERGY 32 Four inverters in parallel Power Connection Communication Connection Five inverters in parallel N L N L Load ...

Страница 35: ...n Built Stabilizer FLIN ENERGY 33 Six inverters in parallel Power Connection Communication Connection 5 2 Support 3 phase equipment Two inverters in each phase Power Connection Power Connection N L N L Load Communication Connection N L N L Load ...

Страница 36: ... the other two phases Power Connection Note It s up to customer s demand to pick 4 inverters on any phase P1 L1 phase P2 L2 phase P3 L3 phase Communication Connection Three inverters in one phase two inverters in second phase and one inverter for the third phase Power Connection N L1 L2 L3 N L1 L2 L3 Load P1 P2 P3 N L1 L2 L3 N L1 L2 L3 Load P1 P2 P3 ...

Страница 37: ...nnection Three inverters in one phase and only one inverter for the remaining two phases Power Connection Communication Connection Two inverters in two phases and only one inverter for the remaining phase Power Connection N L1 L2 L3 N L1 L2 L3 Load P1 P2 P3 N L1 L2 L3 N L1 L2 L3 Load P1 P2 P3 ...

Страница 38: ...zer FLIN ENERGY 36 Communication Connection Two inverters in one phase and only one inverter for the remaining phases Power Connection One inverter in each phase N L1 L2 L3 N L1 L2 L3 Load P1 P2 P3 N L1 L2 L3 N L1 L2 L3 Load P1 P2 P3 Communication Connection ...

Страница 39: ... Connection WARNING Do not connect the current sharing cable between the inverters which are in different phases Otherwise it may damage the inverters 6 PV Connection Please refer to user manual of single unit for PV Connection CAUTION Each inverter should connect to PV modules separately N L1 L2 L3 N L1 L2 L3 Load ...

Страница 40: ...l L1 phase L2 phase L3 phase 30 PV judge condition Only apply for setting Solar first in program 1 Output source priority One Inverter Default When ONE is selected as long as one of inverters has been connected to PV modules and PV input is normal parallel or 3 phase system will continue working according to rule of solar first setting For example two units are connected in parallel and set SOL in...

Страница 41: ...ires of each unit are connected together Step 2 Turn on each unit and set PAL in LCD setting program 28 of each unit And then shut down all units NOET It s necessary to turn off switch when setting LCD program Otherwise the setting cannot be programmed Step 3 Turn on each unit LCD display in Master unit LCD display in Slave unit NOTE Master and slave units are randomly defined Step 4 Switch on all...

Страница 42: ...n Line mode You must exchange the wires of P2 P3 or exchange the setting of P2 P3 LCD display in L1 phase unit LCD display in L2 phase unit LCD display in L3 phase unit Step 5 If there is no more fault alarm the system to support 3 phase equipment is completely installed Step 6 Please switch on all breakers of Line wires in load side This system will start to provide power to the load Note 1 To av...

Страница 43: ... same material type Otherwise please contact your installer to provide SOP to calibrate battery voltage of each inverter 3 If the problem still remains please contact your installer 84 AC input voltage and frequency are detected different 1 2 Check the utility wiring conncetion and restart the inverter Make sure utility starts up at same time If there are breakers installed between utility and inv...

Страница 44: ... 48Vdc 100Ah min Backup Time 48Vdc 200Ah min 5KVA 500 613 1288 1000 268 613 1500 158 402 2000 111 271 2500 90 215 3000 76 182 3500 65 141 4000 50 112 4500 44 100 5000 40 90 Note Backup time depends on the quality of the battery age of battery and type of battery Specifications of batteries may vary depending on different manufacturers ...

Отзывы: