67 |
P a g e
MANTEL CLEARANCE
Combustible mantel clearance can vary per the mantel size and location. Use chart and provided table for information on mantel
install. Do not anchor any mantel or shelf to the fireplace. Only use metal studs above the fireplace as anchor points
Mantel Clearance table and example
REF
Height
Mantel Depth
A
2"
1"
B
4"
4"
C
6"
6"
D
10"
12"
Содержание Corner Right & Left 120
Страница 65: ...65 P a g e COMBUSTIBLE FINISHING MATERIAL CLEARANCES ...
Страница 71: ...71 P a g e EXAMPLES OF HEAT RELEASES ...
Страница 77: ...77 P a g e ELECTRIC AND CONTROL ELECTRIC DIAGRAM SCREEN MV MV PV PV ...
Страница 78: ...78 P a g e ELECTRIC DIAGRAM DOUBLE GLASS OR PV Double Glass Fan Plug No use MV MV PV PV ...
Страница 80: ...80 P a g e ELECTRIC DIAGRAM PV SYSTEM Ports 49 47 are connected to J6 on fireplace main board ...