
HyPower-Geko
Mounting
FläktGroup DC-2014-0022-GB 2018-05/R5 • Subject to modifications
35
4.4.3 Assembly discharge transition piece (ZGH.#A912)
User instructions!
For the assembly of discharge side accessories (discharge sound attenuator, dis-
charge plenum, flexible canvas discharge connection or on-site ducts) on the basic
unit, the discharge transition piece (Order No.: ZGH.#A912, where the # sign indi-
cates the model size of the unit) is absolutely required.
The discharge transition piece is supplied extra with the adhesive tape provided for
sealing the flange of the discharge transition piece and the unit.
Pos. 1: Basic unit
Pos. 2: Discharge transition piece
Pos. 3: Screw M8x25, washer, nut (2 pcs.)
Pos. 4: Insulation tape
•
Stick the adhesive tape above the flange of the
discharge transition piece (fig. 4-11, Pos. 4).
•
Set the flange of the discharge transition piece
in place and screw it on using M8 screws (wash-
ers and nuts) on the side of the air discharge of
the basic unit (see Step 1 to 3., fig. 4-11)
Fig. 4-11: Assembly discharge transition piece
Stick on insulation
tape
Содержание HYPOWER-GEKO
Страница 1: ...HYPOWER GEKO OPERATION MANUAL ...