21
ASSEMBLY INSTRUCTIONS
STEP 11
1. Connect the upper transverse tie rod (A15) to the front end of the upper wire rope (D13) and
use a hook (C9) to connect it.
2. Connect the low horizontal tie rod (A16) to the front end of the bottom wire rope (D15) and
connect it with the chain (C10) and the hook (C9) at both ends.
3. Connect the right protective mesh cover (A17) to the protective mesh cover bracket (C11) on
the top support pipe, and then pull the protective mesh cover down to the protective mesh
cover bracket (C11) on the posterior dasal canal (A3) and fix it.
4. Use the same installation procedure for the left protective mesh cover (A17) .
NEEDS DIAGRAM IMAGE
Содержание HJ-R2P7-PGFJ
Страница 7: ...7 PARTS CHART NEEDS DIAGRAM IMAGE...
Страница 8: ...8 PARTS CHART...
Страница 17: ...17 ASSEMBLY INSTRUCTIONS...
Страница 25: ...25...