18
ASSEMBLY INSTRUCTIONS
STEP 8
1. Put the upper wire rope (D13) through the first pulley frame of the top support pipe (A8),put
the pulley (D4) and the pulley cover (D5), and fix it with bolts (B8) and nuts (B17).
2. Connect the upper wire rope (D13) through the main support pipe (A7) to the second pulley
frame of the top support pipe (A8),place the pulley (D4), and fix it with bolts (D8) and nuts
(B17).
3. The upper wire rope (D13) is lowered and bypassed the pulley (D3), then the pulley (D3) is
connected to the pulley bracket (C8) and fixed with bolts (D8) and nuts (B17).
4. The upper wire rope (D13) is pulled up and wound around the pulley (D3),connected to the
third pulley frame of the top support pipe (A8), and fixed with bolts (B8) and nuts (B17).
5. Draw the upper wire rope (D13) down between the two guide rods (A5), pass through the
large washer (B19), and fix it on the weight selection tube (A6).
Содержание HJ-R2P7-PGFJ
Страница 7: ...7 PARTS CHART NEEDS DIAGRAM IMAGE...
Страница 8: ...8 PARTS CHART...
Страница 17: ...17 ASSEMBLY INSTRUCTIONS...
Страница 25: ...25...