20
ASSEMBLY INSTRUCTIONS
STEP 10
1. Put the bottom wire rope (D15) through the kick pipe (A10), put the short bushing (D16) into
the holes on both sides of the kick pipe (A10),then put the pulley (D3), and fix it with bolt (B22)
washer (B12) and nut (B17).
2. The bottom wire rope (D15) is passed through the opening space at the lower part of the
vertical support pipe (A2), and the bottom wire rope (D15) is pulled up and wound around the
pulley (D3) through the rear opening space of the seat cushion pipe (A4). Then put the long
bushing (D17) into the holes on both sides of the seat tube (A4), insert the pulley (D3), and fix
it with bolt (B4) washer (B12) long bushing (D17) and nut (B17).
3. Pull the bottom wire rope (D15) up and around the pulley (D3), connect the pulley (D3) to the
double pulley bracket (C7),and fix it with bolts (B8) and nuts (B17).
4. Draw down the bottom wire rope (D15) and wrap it around the pulley (D3). Connect the pulley
(D3) to the pulley frame of the seat tube (A4). Fix it with bolts (B8) and nuts (B17).
5. Pull the bottom wire rope (D15) up and around the pulley (D3), connect the pulley (D3) to the
pulley bracket (C8),and fix it with bolts (B8) and nuts (B17).
6. Draw down the bottom wire rope (D15) and connect it with chain (C10) and hook (C9) on the
posterior basal canal (A3)
.
Note: adjust the wire rope (D15) to enough and fix the chain position with hook
NEEDS DIAGRAM IMAGE
Содержание HJ-R2P7-PGFJ
Страница 7: ...7 PARTS CHART NEEDS DIAGRAM IMAGE...
Страница 8: ...8 PARTS CHART...
Страница 17: ...17 ASSEMBLY INSTRUCTIONS...
Страница 25: ...25...