20
Integrated Performance Monitor (IPM) Operation
RE-CALIBRATION PROCEDURE
1. Preset RESET to clear the monitor.
2. Press and hold SET and LEVEL + for
5 seconds.
3. The display will show CAL.
4. Press SET to start re-calibration OR
press any other button to cancel and
return to main display screen.
5. During re-calibration the IPM will
show animated progress in the upper
display and the Green Fluid Assist
®
LED Indicator will illuminate while the
motor is running.
9. When a fault occurs the error number
will be shown with the Err message (See
the Troubleshooting Section for further
information).
10. Press any key to return to main display.
6. Wait until display shows ‘dOnE’.
7. On success the display will show
Level 10 and the motor speed in the
Rate field. This is the equivalent time
taken to change from Level 1 to Level
20 in seconds (The ideal range for
this value is 15-25s).
8. Press any key to return to main
display.
Содержание Vortex VX3 FA
Страница 1: ...USER GUIDE...