19
Maintenance
Item
Time Frame
Instructions
Notes
Seat Wheels and
Runners
Weekly
Wipe down Seat Wheels and
Runners with lint free cloth.
Frame
Weekly
Wipe down Frame with lint free
cloth.
Tank and Water
Treatment
12 months to 2
years
Follow instructions as specified in
the “Water
Treatment”
section of
this manual.
Bungee Cord
Check every
hundred hours for
correct tension
and for signs of
wear.
The Bungee Cord should last for
many years. If a Bungee Cord
change is required, please contact
your local service representative
or go online at
www.firstdegreefitness.com for
further details.
Rowing Belt
Check every
hundred hours for
correct tension
and for signs of
wear.
The Rowing Belt should provide
many years of trouble free use.
If a Rowing Belt change is
required, please contact
your local service representative
or go online at
www.firstdegreefitness.com
for further details.
All preventive maintenance activities must be performed on a regular basis. Performing
routine preventive maintenance actions can aid in providing safe, trouble-free operation
of all FIRST DEGREE FITNESS equipment.
FIRST DEGREE FITNESS is not responsible for performing regular inspection and
maintenance actions for your machines. Instruct all personnel in equipment inspection
and maintenance actions and also in accident reporting and recording.
FIRST DEGREE FITNESS representatives are available to answer any questions that you
may have.
Содержание NEPTUNE AR
Страница 1: ...NEPTUNE AR TITAN AR USER GUIDE...